केंद्रीय - 7 दिनों के अंदर बंद होने वाली निविदाएं

कुल निविदाएं : 11871
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी राज्य का नाम शुद्धिपत्र
6611. 23-Jun-2026 06:03 PM 10-Jul-2026 03:00 PM 10-Jul-2026 03:30 PM Engaging of Certification Body for ISCC CORSIA certification/3600002734/1 Mangalore Refinary and Petrochemicals Limited icon image
6612. 18-Jun-2026 06:07 PM 10-Jul-2026 03:00 PM 10-Jul-2026 03:00 PM 1) Marine lines to Prabhadevi, Matunga Road, Mahim junction & Khar road stations:- Need based repair on day to day basis for 730 days. (2) Dadar (Railway Station) :- Need based repair on day to day basis for a period of 730 days. (3) Bandra (Railway Station) :- Need based repair on day to day basis for a period of 730 days/BCT-26-27-72/89882586 Ministry of Railways --
6613. 07-Jul-2026 11:30 AM 10-Jul-2026 03:00 PM 11-Jul-2026 03:00 PM SUPPLY OF ALLOY STEEL FITTINGS-V/TP/082176C/NRL/PQ/220B/2026_NRL_916163_1 Numaligarh Refinery Limited --
6614. 18-Jun-2026 03:01 PM 10-Jul-2026 03:00 PM 10-Jul-2026 03:00 PM Miscellaneous P-way works including BG track linking, turnouts and SEJ installation, In-situ fabrication and Assembly of Glued joints, Dismantling of Existing track and turnouts, Ballast Supply as per RDSO specification for track ballast IRS-GE-I (June 2004) (with updated correction slips ) and Spreading, Leading of P-way materials, AT welding, and other ancillary activities in connection with 3rd Line between Dilkusha-Malhaur (8.20 Km) of Northern Railway under Dy CE/C-IV/Lucknow ./87-Tender-DyCE-C-IV-LKO/89289038 Ministry of Railways --
6615. 16-Jun-2026 04:00 PM 10-Jul-2026 03:00 PM 13-Jul-2026 03:30 PM Procurement of OEM spares for tata powerlux dg sets for fy 2026-27/CW1MS26004/2026_ONGC_280847_1 Oil and Natural Gas Corporation Limited icon image
6616. 18-Jun-2026 04:08 PM 10-Jul-2026 03:00 PM 10-Jul-2026 03:00 PM Gati Shakti - Secunderabad Division - SC-WADI & VKB-PRLI Section : (i) Proposed Parli Vaijanath station for connecting Parli vaijnath- Latur Road & Parli vaijnath -Parbhani Main lines - Electrical Arrangements (ii) Proposed New Byepass Line at Latur Road station for connecting Latur Road - Parli vaijnath & Latur Road - Kurduwadi Main lines - Electrical Arrangements/C-E-GS-SC-4-OT-2026-27/89297250 Ministry of Railways --
6617. 18-Jun-2026 06:57 PM 10-Jul-2026 03:00 PM 10-Jul-2026 03:00 PM Salem Division: Digitalization of SM Registers at Two Stations in Salem Division./SA-SG-120-I-OT-09-2026/89859366 Ministry of Railways --
6618. 18-Jun-2026 11:03 AM 10-Jul-2026 03:00 PM 10-Jul-2026 03:00 PM [1]Provision of STP (50KLD) with UG tank, Water Supply Pipeline, Pump house & Waste water flow system at Railway Hospital, Solapur.[2] Sewage treatment plant (50 KLD) with UG tank, water pipe line & pump house at SDB under ADEN/KLBG./19-2026-SrDENS/89373256 Ministry of Railways --
6619. 01-Jul-2026 05:48 PM 10-Jul-2026 03:00 PM 10-Jul-2026 03:30 PM 85/EE-II/SD/AE-AIIMS/2026-27 (RECALL)/85/EE-II/SD/AE-AIIMS/2026-27 (RECALL)/160053 Central Public Works Department (CPWD) --
6620. 18-Jun-2026 04:23 PM 10-Jul-2026 03:00 PM 10-Jul-2026 03:00 PM Structural repairs and replacement of corroded/loose rivets & other steel members and painting of track girder bridges in various section(CSMT-CLA, CLA-TMBY, TNA-VSH) of Mumbai division.(09 bridges)/CR-BR062026-27/89418004 Ministry of Railways --

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।