| क्र.सं. |
ई-प्रकाशन तिथि |
बोली जमा करने की अंतिम तिथि |
निविदा खुलने की तिथि |
शीर्षक/संदर्भ संख्या/निविदा आईडी |
राज्य का नाम |
शुद्धिपत्र |
| 13181. |
14-Aug-2026 06:30 PM |
29-Aug-2026 05:00 PM |
31-Aug-2026 11:30 AM |
Construction of PCC Road at Ward No. 01 from Old NH 33 to Ram Awadh Yadav house/P/IV/25/TC-14/P05/2026-27/2026_DGDE_784634_1 |
Directorate General Defence Estates |
-- |
| 13182. |
04-Aug-2026 01:00 PM |
29-Aug-2026 05:00 PM |
31-Aug-2026 11:00 AM |
Supply of Dry Ration/Edible Oil/Spiced /Millets ration items/IV/Grainshop/Tender/Dry Ration/2026-27-422/2026_ITBP_919571_1 |
DG, Indo-Tibetan Border Police Force |
-- |
| 13183. |
14-Aug-2026 06:00 PM |
29-Aug-2026 05:00 PM |
01-Sep-2026 04:00 PM |
Package No. AP20PIVV01, L021-Bangaruvalasa Jn. to Koppara via K.Chakirapalli in Vangara Mandal of Vizianagaram District. (First Call)/NIT No.147/2026-27, Dt.07.08.2026 of the Engineer-in-Chief, PR, PMGSY, Vijayawada./2026_ENCPR_149176_1 |
National Rural Roads Development Agency (NRRDA) |
-- |
| 13184. |
08-Aug-2026 09:00 AM |
29-Aug-2026 05:00 PM |
31-Aug-2026 11:00 AM |
Procurement of Senaptic Sensory Station, Psychology Equipment/No. SAI/NCOE/ Senaptic Sensory Station (Psychology/2026_SAI_921230_1 |
Sports Authority of India |
-- |
| 13185. |
17-Aug-2026 10:00 AM |
29-Aug-2026 05:00 PM |
31-Aug-2026 11:00 AM |
Erection of two dedicated 6.6 KV OH Line feeders for supplying power to KCC Camp from Old Dipka Substation and 1000 TPH Crusher and Semi-mobile crusher from Renki Substation at quarry of Dipka No. 1A OC Mine./SECL/GM/DA/SO(EnM)/ e-tender/26-27/36 dtd-14/08/26/2026_SECL_363823_1 |
South Eastern Coalfields Limited |
-- |
| 13186. |
17-Aug-2026 10:00 AM |
29-Aug-2026 05:00 PM |
31-Aug-2026 11:00 AM |
1).Replacement of PCC pole/damaged pole and laying of Aerial bunch cable, with distribution boxes for providing power supply from Shramik chowk to Thana chowk and BSES chowk.2).Erection of lighting line for transporting road from Unnati chowk at DEP./SECL/GM/DA/SO(EnM)/ e-tender/26-27/43 dtd-14/08/26/2026_SECL_363839_1 |
South Eastern Coalfields Limited |
-- |
| 13187. |
17-Jul-2026 05:00 PM |
29-Aug-2026 05:00 PM |
03-Sep-2026 04:00 PM |
Construction of Permanent Office Building for Ratle HPCL at Joshana Drabshalla, Kishtwar/RH/RATLE/PnC/C-078/2026/2026_RHPCL_284328_1 |
Ratle Hydroelectric Power Corporation Limited |
 |
| 13188. |
31-Jul-2026 10:00 AM |
29-Aug-2026 05:00 PM |
31-Aug-2026 11:30 AM |
Construction of 2 nos of multistoried Tower Blocks (Stilt plus 12 storied) comprising of 144 nos of type D SPECIAL residential quarters in phase-3 at Kaiga township./CPPP/2026/124/2026_NPCIL_285490_1 |
Nuclear Power Corporation Of India Limited |
 |
| 13189. |
13-Aug-2026 06:00 PM |
29-Aug-2026 05:00 PM |
01-Sep-2026 04:00 PM |
Package No.AP24PIVP05, L027-Vetaganivalasa sathabi Road to Panivalasa via Borramamidi in Pachipenta Mandal of Parvathipuram Manyam District. (First Call)/NIT No.104/2026-27, Dt.07.08.2026 of the Engineer-in-Chief, PR, PMGSY, Vijayawada./2026_ENCPR_149131_1 |
National Rural Roads Development Agency (NRRDA) |
-- |
| 13190. |
21-Aug-2026 06:55 PM |
29-Aug-2026 05:00 PM |
31-Aug-2026 09:00 AM |
Maintenance of 11KV D.G Feeder No.1 and 2 from Jealgora Substation to Patherdih Coal Washery under EWZ Area./BCCL/EWZ/NLWPCW/2026-27/001/2026_BCCL_364136_1 |
Bharat Coking Coal Limited |
-- |