| क्र.सं. |
ई-प्रकाशन तिथि |
बोली जमा करने की अंतिम तिथि |
निविदा खुलने की तिथि |
शीर्षक/संदर्भ संख्या/निविदा आईडी |
राज्य का नाम |
शुद्धिपत्र |
| 41. |
08-Oct-2026 05:00 PM |
19-Oct-2026 10:00 AM |
20-Oct-2026 10:00 AM |
epair of blade front portion, back portion and side portion of dozer E12045 at ANT ST KUJAMA, Lodna BCCL/BCCL/LA/EXC/E-TENDER/26-27/50/2026_BCCL_366795_1 |
Bharat Coking Coal Limited |
-- |
| 42. |
07-Oct-2026 06:55 PM |
19-Oct-2026 10:00 AM |
20-Oct-2026 10:00 AM |
Cleaning, repairing and bolt fitting of swing rack gear segment with replacement of broken bolts and fitting and tightening of swing rack gear bolts of 24 96 Saurav and Gaurav dragline on labour charge basis./Bina/SO(Excv)/Tender/26-27/30 dt 7.10.26/2026_NCL_366678_1 |
Northern Coalfields Limited |
 |
| 43. |
07-Oct-2026 06:55 PM |
19-Oct-2026 10:00 AM |
20-Oct-2026 10:00 AM |
Repairing fabrication of exhaust muffler and engine cover base and mast pin base top cover etc. of REL650DII and IDM30DII diesel drill machines/Bina/SO(Excv)/Tender/26-27/36 dt 07.10.2026/2026_NCL_366703_1 |
Northern Coalfields Limited |
-- |
| 44. |
07-Oct-2026 06:55 PM |
19-Oct-2026 10:00 AM |
20-Oct-2026 10:00 AM |
Daily cleaning of mud, oil, grease etc. of the Under carriage assembly of 10 nos. Dozers and daily cleaning of operator cabin of 25 nos. HEMMs in Dozer Auxiliary section for 730 days on labour charge basis./Bina/SO(Excv)/Tender/26-27/35 dt07.10.2026/2026_NCL_366698_1 |
Northern Coalfields Limited |
-- |
| 45. |
07-Oct-2026 06:55 PM |
19-Oct-2026 10:00 AM |
20-Oct-2026 10:00 AM |
Repairing of 02 No. Mast raising Cylinder Partno 70578430 of IDM70EDrill at Bina Project/Bina/SO(Excv)/Tender/26-27/37/2026_NCL_366742_1 |
Northern Coalfields Limited |
-- |
| 46. |
07-Oct-2026 06:55 PM |
19-Oct-2026 10:00 AM |
20-Oct-2026 10:00 AM |
Repairing fabrication of front and rear half cover of bull gear of Drag system of Saurav Dragline and Hoist system of Gaurav Drag line./Bina/SO(Excv)/Tender/26-27/32 dt 7.10.2026/2026_NCL_366680_1 |
Northern Coalfields Limited |
-- |
| 47. |
07-Oct-2026 06:55 PM |
19-Oct-2026 10:00 AM |
20-Oct-2026 10:00 AM |
Repairing rebuilding of 12 nos. worn out Guide Pul leys and 04 nos. Dump Pulley of 24 96 draglines on labour charge basis/Bina/SO(Excv)/Tender/26-27/31 dt 7.10.2026/2026_NCL_366679_1 |
Northern Coalfields Limited |
-- |
| 48. |
07-Oct-2026 06:55 PM |
19-Oct-2026 10:00 AM |
20-Oct-2026 10:00 AM |
Annual Maintenance Contract for complete lubrication system of 24 96 Saurav and Gaurav Dragline working at Bina Project for 365 days/Bina/SO(Excv)/Tender/26-27/33 dt 7.10.2026/2026_NCL_366681_1 |
Northern Coalfields Limited |
-- |
| 49. |
08-Oct-2026 05:00 PM |
19-Oct-2026 10:00 AM |
20-Oct-2026 10:00 AM |
Repair of 01no air compressor of AC system with blower motor of Motor grader GD 825/25142 at ANTST KUJAMA, Lodna area, BCCL/BCCL/LA/EXC/E-TENDER/26-27/48/2026_BCCL_366791_1 |
Bharat Coking Coal Limited |
-- |
| 50. |
07-Oct-2026 06:00 PM |
19-Oct-2026 10:00 AM |
20-Oct-2026 10:00 AM |
Repairing of GOAB Switch, Lightning Arrester and Limit Switch at Govindpur U/G Project, Kathara Area/P.E(E and M)/GVP (U/G)/E-Tender/2026-27/01, Dt-07.10.2026/2026_CCL_366700_1 |
Central Coalfields Limited |
-- |