केंद्रीय - आज बंद होने वाली निविदाएं

कुल निविदाएं : 707
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी राज्य का नाम शुद्धिपत्र
61. 24-Jun-2025 06:00 PM 05-Jul-2025 11:00 AM 07-Jul-2025 11:00 AM (A)Repair, fabrication and erection of complete base supporting structure with supporting channels, angles, joist and entire platform with supporting channel, angle and plate of Unit No. 250 (B)fabrication and erection of 02 nos. stairs with supporti/PO/KTW/EnM/eTen/25-26/27 Dated-24.06.2025/2025_CCL_338304_1 Central Coalfields Limited --
62. 24-Jun-2025 06:30 PM 05-Jul-2025 11:00 AM 07-Jul-2025 11:00 AM Cold vulcanizing of different belts of Kathara Washery/PO/KTW/EnM/eTen/25-26/32 Dated-24.06.2025/2025_CCL_338314_1 Central Coalfields Limited --
63. 25-Jun-2025 06:15 PM 05-Jul-2025 11:00 AM 05-Jul-2025 02:00 PM Procurement of 1 SET OF MECHANICAL SEAL SPARES (DE AND NDE) FOR 90-G-01ABC PUMPS/C16A250065/2025_DGMMC_10002_1 CPCL,DGM(M and C) --
64. 24-Jun-2025 01:47 PM 05-Jul-2025 11:00 AM 05-Jul-2025 11:30 AM 21/EE E-CHENNAI-II/2025-26/CPWD CHENNAI/21/EE E-CHENNAI-II/2025-26/CPWD CHENNAI/117096 Central Public Works Department (CPWD) --
65. 20-Jun-2025 02:25 PM 05-Jul-2025 11:00 AM 05-Jul-2025 02:00 PM MANUFACTURING OF HP HEATER SHELLS ASSLY/E9AYS00012/2025_BHEL_49835_1 Bharat Heavy Electricals Limited icon image
66. 30-Jun-2025 11:00 AM 05-Jul-2025 11:00 AM 07-Jul-2025 04:00 PM PROCUREMENT OF BLUESTAR MAKE HVAC SYSTEM SPARES FOR TANDA STAGE_II FOR/NTPC/USSC-CPG3/9900301380/2025_NTPC_96175_2 NTPC Limited --
67. 25-Jun-2025 06:00 PM 05-Jul-2025 11:00 AM 05-Jul-2025 03:00 PM CAPITAL MAJOR OVERHAULING OF BOILER ITS AUXILIARIES OF 250 MW UNIT III OF GHTP LEHRA MOHABBAT/CHD/LM-3/BOILER-COH/25_022/2025_BHEL_50009_1 Bharat Heavy Electricals Limited --
68. 24-Jun-2025 06:00 PM 05-Jul-2025 11:00 AM 07-Jul-2025 11:00 AM Hopper Cleaning for conveyor belt, rope, stone concert etc. of unit no. 104 and 109 in Raw Coal Section at Kathara Washery/PO/KTW/EnM/eTen/25-26/30 Dated-24.06.2025/2025_CCL_338310_1 Central Coalfields Limited --
69. 25-Jun-2025 10:00 AM 05-Jul-2025 11:00 AM 07-Jul-2025 12:00 PM Laying and fitting of 6 inch M.S pipe line for installing of pump Motor with foundation at 17-18L/1D of Rana Seam (R-V) at Bhanora West Block Colliery under Satgram-Sripur Area/ECL/SSA/GM/E M/E-NIT/2025-26/13 Date 21.06.2025/2025_ECL_338166_1 Eastern Coalfields Limited --
70. 25-Jun-2025 05:00 PM 05-Jul-2025 11:00 AM 05-Jul-2025 02:00 PM 0.2 X 25 MM EPOXY MICA PAPER TAPE TO AA25101 REV.0/E7853004/E7853004 BHEL Bhopal --