| Sl.No |
e-Published Date |
Bid Submission Closing Date |
Tender Opening Date |
Title/Ref.No./Tender Id |
State Name |
Corrigendum |
| 30091. |
14-Mar-2026 05:00 PM |
15-Apr-2026 02:00 PM |
16-Apr-2026 02:30 PM |
Fabrication, Supply and Erection of roof element Structurals 18 columns in Conveyor 70 Southern side from Column No 380 to 398 Tail end area/CE/TTPS/4123-S/2026_EB_674774_1 |
Tamil Nadu |
-- |
| 30092. |
14-Mar-2026 05:00 PM |
15-Apr-2026 02:00 PM |
16-Apr-2026 02:30 PM |
Supply and Erection of 5th segment spool piece out of total 6 Nos in BFD 2B Bypass discharge chute at PCH II/CE/TTPS/4124-S/2026_EB_674847_1 |
Tamil Nadu |
-- |
| 30093. |
14-Mar-2026 06:00 PM |
15-Apr-2026 02:00 PM |
16-Apr-2026 02:30 PM |
Fabrication and Supply of 200NB SS316 Gr SCH 80 seamless pipes and bends along with fittings of stage III ash slurry pumps air release line/CE / TTPS / 4127 -S/2026_EB_674814_1 |
Tamil Nadu |
-- |
| 30094. |
14-Mar-2026 06:00 PM |
15-Apr-2026 02:00 PM |
16-Apr-2026 02:30 PM |
Supply of Ash Slurry Pump Suction Connecting Spool Pieces of Various Sizes Suitable for Ash Slurry Pump House of Stage I and II/CE / TTPS / 4128 -S/2026_EB_674840_1 |
Tamil Nadu |
-- |
| 30095. |
14-Mar-2026 06:00 PM |
15-Apr-2026 02:00 PM |
16-Apr-2026 02:30 PM |
Fabrication and Supply of 400NB SS 316 Gr Pipes and Fittings for Unit IV Ash Water Pump Discharge Header of Stage III Ash Water Pump House/CE / TTPS / 4125 -S/2026_EB_674851_1 |
Tamil Nadu |
-- |
| 30096. |
14-Mar-2026 06:00 PM |
15-Apr-2026 02:00 PM |
16-Apr-2026 02:30 PM |
Supply of 400NB Spool Piece for Ash Water Pump Line in Unit V/CE/TTPS/4126-S/2026_EB_674874_1 |
Tamil Nadu |
-- |
| 30097. |
16-Mar-2026 06:00 PM |
15-Apr-2026 02:00 PM |
16-Apr-2026 03:00 PM |
Supply of 7/8 SWG and 7/10 SWG STAY WIRE/TN-2108/2026_AVVNL_537497_1 |
Rajasthan |
-- |
| 30098. |
18-Mar-2026 11:00 AM |
15-Apr-2026 02:00 PM |
20-Apr-2026 11:00 AM |
Supply, Installation and Commissioning of 220 V, DC Power Distribution Board for the existing 220 V, DC Network at Rammam Hydel Project Stage II, WBSEDCL./PM/RMM/NIeT/ELECT/2025-26/21, dated 13.03.2026/2026_WBSED_1022490_1 |
West Bengal |
-- |
| 30099. |
18-Mar-2026 11:00 AM |
15-Apr-2026 02:00 PM |
20-Apr-2026 11:00 AM |
Supply, Installation and Commissioning of Charger suitable for 220 VDC, 535 Ah, Plante Lead Acid Battery Bank at Rammam Hydel Project Stage II, WBSEDCL./PM/RMM/NIeT/ELECT/2025-26/22, DATED 13.03.2026/2026_WBSED_1022547_1 |
West Bengal |
-- |
| 30100. |
18-Mar-2026 06:00 PM |
15-Apr-2026 02:00 PM |
15-Apr-2026 02:30 PM |
Supply, Installation, Commissioning and Operation And Maintenance Services (5years) Of Continuous Ambient Air Quality Monitoring Stations (CAAQMS) at 10 Locations in State of Haryana./169/HR/E-5/2025-26/2026_HRY_509279_1 |
Haryana |
-- |