| Sl.No |
e-Published Date |
Bid Submission Closing Date |
Tender Opening Date |
Title/Ref.No./Tender Id |
State Name |
Corrigendum |
| 40391. |
02-May-2026 09:00 AM |
29-May-2026 05:00 PM |
30-May-2026 02:00 PM |
Survey, Investigation and designing (Hydrographic, Hydraulic, Structural etc.) of Proposed Measures for Urban Flood Mitigation in Makhri Khera Area of Kanpur Nagar Nigam including supply of all material, labour, T and P etc. complete/712/E-Tender/78 Date 30/04/2026/2026_UPCDS_1144420_1 |
Uttar Pradesh |
-- |
| 40392. |
02-May-2026 09:00 AM |
29-May-2026 05:00 PM |
30-May-2026 02:00 PM |
Survey, Investigation and designing (Hydrographic, Hydraulic, Structural etc.) of Construction of RCC Drain From Kidwai Nagar Bypass to Pandu River Ramaipur Nala at Kanpur (COD Nala)/713/E-Tender/79 Date 30.04.2026/2026_UPCDS_1144424_1 |
Uttar Pradesh |
-- |
| 40393. |
02-May-2026 03:00 PM |
29-May-2026 05:00 PM |
30-May-2026 11:00 AM |
Construction of 2000 KL CWR at Allahpur/274/Deposit work/10 Date- 29.04.2026/2026_UPJNM_1144606_1 |
Uttar Pradesh |
-- |
| 40394. |
05-May-2026 03:00 PM |
29-May-2026 05:00 PM |
30-May-2026 12:00 PM |
Cleaning work at j.k.loan hospital/01/2026-27/1253/2026_GMCK_556041_1 |
Rajasthan |
-- |
| 40395. |
05-May-2026 05:50 PM |
29-May-2026 05:00 PM |
01-Jun-2026 03:00 PM |
Resurfacing of internal roads by flexible pavement method in Sector - 2, 3, 5, 20, 21 and 23 at Ulwe Node, Navi Mumbai./CA02/CIDCO/EE(Ulwe-I)/2026-27/2026_CIDCO_1300380_1 |
Maharashtra |
-- |
| 40396. |
05-May-2026 06:00 PM |
29-May-2026 05:00 PM |
30-May-2026 12:00 PM |
Construction of Retaining wall parallel to Pandu River and Drain alongside 45.0 mtr. road between railway line and Lucknow Agra NH in Mahaveer Nagar Vistar Yojna./01/EE2/KDA/2026-27/2026_UPKDA_1145560_1 |
Uttar Pradesh |
-- |
| 40397. |
06-May-2026 11:00 AM |
29-May-2026 05:00 PM |
01-Jun-2026 05:00 PM |
Construction of RCC compound retaining wall and hill slope stabilization work at Bhandup Hill Reservoir in S Ward/2026/HE/CM/ES/02/2026_MCGM_1298983_1 |
Maharashtra |
-- |
| 40398. |
06-May-2026 04:45 PM |
29-May-2026 05:00 PM |
01-Jun-2026 03:00 PM |
Design and construction of bridges at two locations connecting Sector - 55 , 56 and Sector -51 , 52 at Dronagiri Node, Navi Mumbai./01/CIDCO/EE(Dron-I)/2026-27/2026_CIDCO_1300448_1 |
Maharashtra |
-- |
| 40399. |
06-May-2026 05:00 PM |
29-May-2026 05:00 PM |
01-Jun-2026 12:00 PM |
PU/AMC-Helium/Chem/26-27/ 01/PU/AMC-Helium/Chem/26-27/ 01/2026_PU_1023767_1 |
West Bengal |
-- |
| 40400. |
07-May-2026 12:35 PM |
29-May-2026 05:00 PM |
30-May-2026 11:00 AM |
Construction Of Boundary Wall, Guard Room with Gate at Proposed College of Veterinary and Animal Sciences, Bharatpur./NIT 02/2026-27 of EO, RUVAS (Jobner), Jaipur//2026_RUVAJ_557094_1 |
Rajasthan |
-- |