| Sl.No |
e-Published Date |
Bid Submission Closing Date |
Tender Opening Date |
Title/Ref.No./Tender Id |
State Name |
Corrigendum |
| 26101. |
01-Oct-2025 04:00 PM |
10-Dec-2025 04:00 PM |
10-Dec-2025 05:00 PM |
Procurement of Span Markers (Globules)(100 Nos.) and Obstruction (Aviation)(195 sets) lights/Contract-I/NIB/2025-26/ BN-9018002529/2025_RRVPN_504221_1 |
Rajasthan |
 |
| 26102. |
28-Nov-2025 02:00 PM |
10-Dec-2025 04:00 PM |
11-Dec-2025 12:00 PM |
Construction of Drain on road from NH to House of Abdul Rashid Sheikh Bagandar Barsoo./134/EEA/RNB of 2025-26/7229-39 Dated 28-11-2025/2025_PWDJK_296672_1 |
Jammu and Kashmir |
-- |
| 26103. |
29-Sep-2025 04:00 PM |
10-Dec-2025 04:00 PM |
10-Dec-2025 05:00 PM |
Fabrication, Galvanising, Testing and supply of 765kVS/C and 400kV D/C (Quad and Twin moose) transmission line towers including stubs and Extns. Along with Nuts and Bolts as per Nigams design/RVPN/EHV/BN-9018002523/2025_RRVPN_503900_1 |
Rajasthan |
 |
| 26104. |
26-Sep-2025 10:00 AM |
10-Dec-2025 04:00 PM |
12-Dec-2025 04:00 PM |
Service Contract for operation assistance job under Operation dept. and RC for DM plant for different maintenance job under TM dept. at STPS for 2(two) years/WBPDCL/STPS/NIT/E4196/25-26/2025_WBPDC_907660_1 |
West Bengal |
 |
| 26105. |
12-Sep-2025 10:00 AM |
10-Dec-2025 04:00 PM |
11-Dec-2025 02:00 PM |
Replacement of Damaged 33kV, 3-Phase, 50Hz Outdoor Type ONAN Cooled CT-PT Combined Metering Unit along with other allied works at WSS Tangnar Stage 2nd/JSMDS/e-NIT-16 of 09/2025/2025_PHE_287965_1 |
Jammu and Kashmir |
 |
| 26106. |
28-Nov-2025 06:00 PM |
10-Dec-2025 04:00 PM |
11-Dec-2025 05:00 PM |
Scoping Study to Identify Forest Place Culture and opportunities to create Circular Economy based MSME Clusters and establish an incubation center to nurture Forest Place Culture and Circular Economy based MSME entrepreneurial ventures under the RAMP/JIIDCO/RAMP/19/2025-26/2025_JIIDC_107176_1 |
Jharkhand |
-- |
| 26107. |
09-Sep-2025 02:00 PM |
10-Dec-2025 04:00 PM |
10-Dec-2025 05:00 PM |
Design, Supply, Installation, integration and Commissioning and Maintenance of Remote Terminal Unit (RTU) and Phasor Measurement Unit (PMU) including replacement of old and Obsolete RTU/RVPN/EHV/ASP/TN-126/2025_RRVPN_499663_1 |
Rajasthan |
 |
| 26108. |
07-Aug-2025 09:00 AM |
10-Dec-2025 04:00 PM |
12-Dec-2025 04:00 PM |
Supply of Hi - Chrome Liner Sets for Ms Stein, France make BBD 4772 Ball Mills for Anpara BTPS/S-PAR/C/MMC2/PD01/ 6000003730/2025_RVUNL_1063806_1 |
Uttar Pradesh |
 |
| 26109. |
02-Aug-2025 11:00 AM |
10-Dec-2025 04:00 PM |
12-Dec-2025 06:00 PM |
Supply of 6.6KV Power Trailing cable, 4C X 50 Sq. mm. for Stacker/Re-claimer of Secondary Crusher for CHD-II, BTPS Anpara./T-163/PD-I/MMC-II/ATP/2025-26/2025_RVUNL_1062290_1 |
Uttar Pradesh |
 |
| 26110. |
25-Jun-2025 04:00 PM |
10-Dec-2025 04:00 PM |
10-Dec-2025 04:30 PM |
Procurement of Textile Goods for 470 Creches/01/HR/WCD/2025-26/2025_HRY_453961_1 |
Haryana |
 |