| Sl.No |
e-Published Date |
Bid Submission Closing Date |
Tender Opening Date |
Title/Ref.No./Tender Id |
State Name |
Corrigendum |
| 31041. |
08-Jul-2026 10:30 AM |
12-Aug-2026 12:00 PM |
13-Aug-2026 12:00 PM |
Running of PCC Pole factory on as is where is basis at Harda/GM(C)/BPL/23/01/2026_MKVVC_519795_1 |
Madhya Pradesh |
 |
| 31042. |
09-Jul-2026 04:15 PM |
12-Aug-2026 12:00 PM |
13-Aug-2026 12:00 PM |
Providing and Fixing AC Power Cubical Box/ET_02_ETC_A_26_27/2026_UPTCL_1141254_2 |
Uttar Pradesh |
 |
| 31043. |
10-Jul-2026 01:30 PM |
12-Aug-2026 12:00 PM |
13-Aug-2026 12:00 PM |
Construction of 33 KV Jal Jeevan Mission Bay/ET_29_ETC_A_26_27/2026_UPTCL_1168222_1 |
Uttar Pradesh |
 |
| 31044. |
10-Jul-2026 02:00 PM |
12-Aug-2026 12:00 PM |
17-Aug-2026 11:00 AM |
Manufacturing, stacking, curing and testing of 45,600 no 9m long PCC poles and 5120 no. 11m long PCC poles as per PSPCL specifications at Pilot Workshop, Sarna/04/2026-27/PWMDI/2026_POWER_171622_1 |
Punjab |
-- |
| 31045. |
13-Jul-2026 12:50 PM |
12-Aug-2026 12:00 PM |
13-Aug-2026 12:00 PM |
Dismantling , Carriage and Erection work of 10 MVAR Capacitor Bank/ET_30_ETC_A_26_27/2026_UPTCL_1168785_1 |
Uttar Pradesh |
 |
| 31046. |
13-Jul-2026 01:00 PM |
12-Aug-2026 12:00 PM |
14-Aug-2026 12:00 PM |
SITC of Fire Dectection system/WBPWD/EE-I/KSHED/Q25/26-27/2026_WBPWD_5016700_1 |
West Bengal |
 |
| 31047. |
13-Jul-2026 02:00 PM |
12-Aug-2026 12:00 PM |
14-Aug-2026 12:00 PM |
E.I. work/WBPWD/EE-I/KSHED/Q26/26-27/2026_WBPWD_5016706_1 |
West Bengal |
 |
| 31048. |
13-Jul-2026 04:30 PM |
12-Aug-2026 12:00 PM |
12-Aug-2026 03:00 PM |
Work of Providing a dual source of power supply to the offices of SE, ETC-I and ETC-II, Panki, Kanpur from Main ACDB of 220 KV SS Panki, by excavation of cable trench and laying of (2 Nos) 3.5coreX50sq.mm Aluminium Power Cable./STET06/E220KVS/SD(P)-2026-27/2026_UPTCL_1168822_1 |
Uttar Pradesh |
 |
| 31049. |
14-Jul-2026 04:00 PM |
12-Aug-2026 12:00 PM |
13-Aug-2026 03:00 PM |
Construction of RCC drain on both sides of the 18.00-meter-wide road in the Lohiyanagar Residential Scheme, extending from the Tempo Stand to the Odeon Nala./37219_1 Dated 10 July 2026/2026_MDAUP_1168985_1 |
Uttar Pradesh |
-- |
| 31050. |
14-Jul-2026 04:00 PM |
12-Aug-2026 12:00 PM |
13-Aug-2026 03:00 PM |
Construction of drains and laying of water supply lines from BC-9 to BC-16 in Pocket-B of Ram Manohar Lohia Nagar, along with development works near commercial plots BC-11, BC-12 and BC-13./38946_1 Dated 10 July 2026/2026_MDAUP_1169016_1 |
Uttar Pradesh |
-- |