Sl.No |
e-Published Date |
Bid Submission Closing Date |
Tender Opening Date |
Title/Ref.No./Tender Id |
State Name |
Corrigendum |
48161. |
09-Sep-2025 06:55 PM |
16-Sep-2025 06:55 PM |
18-Sep-2025 11:30 AM |
Preparation of DPR for Thonikkadavu Kariyathumpara Tourism Project cost amounting to Rs. 2.00 crore with detailed soil investigation 3 bore holes, Survey, Structural, Design, Data Observed Data, Drawings, and Detailed Estimate etc. at Koor/EE/KyIP/01/2025-26/2025_Irrig_787783_2 |
Kerala |
-- |
48162. |
09-Sep-2025 06:55 PM |
16-Sep-2025 06:55 PM |
18-Sep-2025 11:30 AM |
GENERAL-KyIP - ACP (NP) 2025-26- Clearing and desilting of Maniyur distributary canal between ch 0/000 km and tail end and Poovampuzha sub distributary canal between ch. 0/000 km and ch 1/800 km-General Civil Work/IRR/PI/TR/4159/2025_5_13_12/1/2025_Irrig_786925_3 |
Kerala |
-- |
48163. |
09-Sep-2025 06:55 PM |
16-Sep-2025 06:55 PM |
18-Sep-2025 11:30 AM |
GENERAL KyIP ACP(NP) 2025 26 Clearing and Desilting of Thiruvangoor distributary canal, Kolakkadu FB,Kappad sub distributary and its FBs General Civil Work/IRR/PI/TR/4143/2025_5_15_14/1/2025_Irrig_784746_3 |
Kerala |
-- |
48164. |
09-Sep-2025 06:55 PM |
16-Sep-2025 06:55 PM |
18-Sep-2025 11:30 AM |
GENERAL KyIP ACP(NP) 2025 26 Clearing and Desilting of Elattery distributary, Kanayankode distributary,Melur FB and Edakkulam FB-General Civil Work/IRR/PI/TR/4143/2025_5_1_13/1/2025_Irrig_784671_3 |
Kerala |
-- |
48165. |
09-Sep-2025 06:55 PM |
16-Sep-2025 06:55 PM |
18-Sep-2025 11:30 AM |
GENERAL-KyIP ACP (NP) 2025-26-Clearing jungle and desilting of Thiruvallur Sub Distributary Canal-General Civil Work/IRR/PI/TR/2354/2025_5_7_6/1/2025_Irrig_784371_3 |
Kerala |
-- |
48166. |
09-Sep-2025 06:55 PM |
16-Sep-2025 06:55 PM |
18-Sep-2025 11:30 AM |
GENERAL-KyIP ACP (NP) 2025-26-Clearing jungle and desilting of East velom FB, North Velom FB, Kurichakam FB and Peruvayal FBGeneral Civil Work/IRR/PI/TR/2354/2025_5_10_9/1 The/2025_Irrig_784270_3 |
Kerala |
-- |
48167. |
09-Sep-2025 06:55 PM |
16-Sep-2025 06:55 PM |
18-Sep-2025 06:55 PM |
INSTALLATION OF100 NOS. OF ELETRIC STREET LIGHT FROM THE HOUSE OF SUNIL BISWAS TO THE HOUSE OF BHABATOSH ROY UNDER DEYPARA GP UNDER KRISHNAGAR_I BLOCK UNDER APAS 2025_26 ID APAS_01_085_117_0001, Sl. No. 1/WBNADIA/APAS/BDO/KRI/17/25-26/2025_DMN_899240_1 |
West Bengal |
-- |
48168. |
09-Sep-2025 06:55 PM |
16-Sep-2025 06:55 PM |
18-Sep-2025 06:55 PM |
CONSTRUCTION OF BOUNDARY WALL AND DEVELOPMENT OF GROUND AT SHIMULTALA NABAKUMAR ROY ICDS CENTRE, BALIR MATH, SHIMULTALA UNDER DEYPARA GP UNDER KRISHNAGAR_I BLOCK UNDER APAS 2025_26 ID APAS_01_085_118_0001, Sl. No. 2/WBNADIA/APAS/BDO/KRI/17/25-26/2025_DMN_899240_2 |
West Bengal |
-- |
48169. |
09-Sep-2025 06:55 PM |
16-Sep-2025 06:55 PM |
18-Sep-2025 06:55 PM |
INSTALLATION OF SOLAR POWERED STREET LIGHT NEAR THE HOUSE OF SUJIT MITRA, SUMAN MALLICK BIDYUT GOSAIS ASHRAM AND NEAR THE POND OF PAUL SAHEB UNDER DEYPARA GP UNDER KRISHNAGAR_I BLOCK UNDER NRES 2025_26 ID_ APAS_01_085_119_0003, Sl. No. 3/WBNADIA/APAS/BDO/KRI/17/25-26/2025_DMN_899240_3 |
West Bengal |
-- |
48170. |
09-Sep-2025 06:55 PM |
16-Sep-2025 06:55 PM |
18-Sep-2025 06:55 PM |
Construction of CC Road from the H_O Budho Sardar to the H_O Bipad Sardar at Chabighata under Dignagar GP under Krishnagar_I Block under APAS 2025_26 ID_ APAS_01_085_220_0001, Sl. No. 49/WBNADIA/APAS/BDO/KRI/17/25-26/2025_DMN_899240_49 |
West Bengal |
-- |