Sl.No |
e-Published Date |
Bid Submission Closing Date |
Tender Opening Date |
Title/Ref.No./Tender Id |
State Name |
Corrigendum |
50501. |
12-Sep-2025 12:00 PM |
19-Sep-2025 06:55 PM |
22-Sep-2025 10:00 AM |
Estimate No. 304/CND/2025-26 Providing E.I., Air Conditioning System, Audio System and LED Screen To Auditorium Hall, Conferennce room, SDO Cabin and Tahsildar Cabin In Administrative Building At Mul , Ta. Mul , Dist. Chandrapur./eTender Notice No 42/2025-26/2025_PWDM_1217689_4 |
Maharashtra |
-- |
50502. |
12-Sep-2025 12:10 PM |
19-Sep-2025 06:55 PM |
22-Sep-2025 10:00 AM |
Estimate No. 70/CND/2025-26 Providing E.I, EPABx System, LAN and Networking and CCTV System to Newly Constructed 30 Bedded Rural Hospital at Bhisi, Tah-Chimur, Dist-Chandrapur./eTender Notice No 42/2025-26/2025_PWDM_1217689_5 |
Maharashtra |
-- |
50503. |
12-Sep-2025 12:10 PM |
19-Sep-2025 06:55 PM |
22-Sep-2025 10:00 AM |
Estimate No. 294/GDL/2025-26 Providing Annual Maintenance of E.I of Non Residential Building of PWD Elect. Under Section 1,Gadchiroli./eTender Notice No 42/2025-26/2025_PWDM_1217689_6 |
Maharashtra |
-- |
50504. |
12-Sep-2025 12:15 PM |
19-Sep-2025 06:55 PM |
22-Sep-2025 10:00 AM |
Estimate No. 348/GDL/2025-26 Providing Annual Maintenance of E.I of Non Residential Building of PWD Elect. Under Section 2,Gadchiroli/eTender Notice No 42/2025-26/2025_PWDM_1217689_7 |
Maharashtra |
-- |
50505. |
12-Sep-2025 02:00 PM |
19-Sep-2025 06:55 PM |
20-Sep-2025 10:00 AM |
P/L 250mm, 300mm dia. sewer water pipe line and 100mm PVC water supply line at Babulal wali gali , Baldev wali gali, Samunder wali gali, Ramesh Bainsla wali gali, Sanjay Bhadana wali gali, Kehar Singh wali gali and Gaji wali gali 27ft Road, Dabua Co/2025992E5DC2 D630 451D AC30 9208407D2A85284ULB/2025_HRY_471800_1 |
Haryana |
-- |
50506. |
12-Sep-2025 06:00 PM |
19-Sep-2025 06:55 PM |
20-Sep-2025 11:00 AM |
Widening of intersection points by constructing RMC M-25 Slip roads near Saluja Petrol Pump and others NH-5 in Ward No.15 (New), Faridabad./2025E64D0A5F C701 45F9 BD82 26E05955D444284ULB/2025_HRY_471846_1 |
Haryana |
-- |
50507. |
12-Sep-2025 06:00 PM |
19-Sep-2025 06:55 PM |
20-Sep-2025 11:00 AM |
Widening of road by RMC M-25 from post office to back side of Neelam Cinema, Nehru ground ward no 13, Faridabad./2025FA36A58A 604E 423F 999B 6D4336C620CA284ULB/2025_HRY_471851_1 |
Haryana |
-- |
50508. |
12-Sep-2025 06:00 PM |
19-Sep-2025 06:55 PM |
20-Sep-2025 11:00 AM |
Operation and Maintenance of intermediate sewerage pumping station and storm water disposal in Sainik Colony in Ward No.19 (New), Faridabad (for 11 Months)/202503A208B7 BE2C 4D64 80AF 7308726C435B284ULB/2025_HRY_471853_1 |
Haryana |
-- |
50509. |
12-Sep-2025 06:00 PM |
19-Sep-2025 06:55 PM |
20-Sep-2025 11:00 AM |
Provision of 03 No. New Tube well bore by Reverse Rotary (suitable method) at suitable Locations in NH-1 J -Block Park,Near Nathi Chowk and E-Block Nehru Ground Park in Ward No.13 (New Ward), Faridabad/2025A17F4F14 A2B0 4F38 A55A D87CD3C8F61A284ULB/2025_HRY_471857_1 |
Haryana |
-- |
50510. |
12-Sep-2025 06:00 PM |
19-Sep-2025 06:55 PM |
20-Sep-2025 11:00 AM |
Hiring of Services for Sewerage operation and Maintenance Sewer Lines in Ward No.19 (New), NIT Faridabad (Division-II) for 6 Months. (2025-2026)/20259A2E3547 43F0 4FF9 A4FA F7E4FB5BFEB9284ULB/2025_HRY_471861_1 |
Haryana |
-- |