| Sl.No |
e-Published Date |
Bid Submission Closing Date |
Tender Opening Date |
Title/Ref.No./Tender Id |
State Name |
Corrigendum |
| 1881. |
08-Jun-2026 11:00 AM |
22-Jun-2026 02:00 PM |
23-Jun-2026 11:00 AM |
abdul rahman house to kayum house cc road nali and earth filling work/5330NPPMAUDAHA/2026_DOLBU_1157817_16 |
Uttar Pradesh |
-- |
| 1882. |
08-Jun-2026 11:00 AM |
22-Jun-2026 02:00 PM |
23-Jun-2026 11:00 AM |
ward no 04 meera talab me manish shukla house to dhaniram house cc road/5330NPPMAUDAHA/2026_DOLBU_1157817_17 |
Uttar Pradesh |
-- |
| 1883. |
08-Jun-2026 11:00 AM |
22-Jun-2026 02:00 PM |
23-Jun-2026 11:00 AM |
nagar palika parishad maudaha ke gata number me paudha ropad ka karya/5330NPPMAUDAHA/2026_DOLBU_1157817_19 |
Uttar Pradesh |
-- |
| 1884. |
08-Jun-2026 03:00 PM |
22-Jun-2026 02:00 PM |
23-Jun-2026 03:00 PM |
modern irrigation system for nursury/store/1501 dt 05-06-25026/2026_MPFD_513527_1 |
Madhya Pradesh |
-- |
| 1885. |
08-Jun-2026 11:30 AM |
22-Jun-2026 02:00 PM |
23-Jun-2026 03:30 PM |
T/L arran. (Street Light/Fan/Tube/Bulb/ Socket/Generator) on Elec. Pole insta. in differ. road and differ. Pandaals/ Kavariya Que Corridor/ Que Comp. etc in Deoghar Dist. on the occasion of Shrawani Mela 2026 from 29.07.2026 to 28.08.2026 (31 days)./Energy/EWD/Dumka/04/2026-27/2026_ENRGY_114876_1 |
Jharkhand |
 |
| 1886. |
08-Jun-2026 11:30 AM |
22-Jun-2026 02:00 PM |
23-Jun-2026 03:30 PM |
T/L arang. of LED Rope Light on Elec. Pole inst. from Dumma Gate kanvariya Path to Deoghar Baba mandir, and other important roads in the Deoghar Town on the occasion of Shrawani Mela 2026 from 29.07.2026 to 28.08.2026 (31 days)./Energy/EWD/Dumka/04/2026-27/2026_ENRGY_114876_2 |
Jharkhand |
 |
| 1887. |
08-Jun-2026 11:45 AM |
22-Jun-2026 02:00 PM |
23-Jun-2026 03:00 PM |
Comp. AMC of 4 nos OTIS Lift 1 no 14 Passenger Capacity, 3 no 10 Passenger capacity with ARD and Door Sensor Installed at 40 Court Building, Civil Court, Ranchi for the Period of 3 years./Energy/EWD/Ranchi/12/2026-27/2026_ENRGY_114877_1 |
Jharkhand |
-- |
| 1888. |
08-Jun-2026 03:00 PM |
22-Jun-2026 02:00 PM |
23-Jun-2026 03:00 PM |
Construction of Protection Wall with G.I. Chain Link Fencing for East Side in the Campus of Zonal Research Station, Darisai under BAU, Kanke, Ranchi./124 Dated 04.06.2026/2026_BAU_114878_4 |
Jharkhand |
-- |
| 1889. |
08-Jun-2026 03:00 PM |
22-Jun-2026 02:00 PM |
23-Jun-2026 03:00 PM |
Construction of a farm equipment cum store (size 60 x 20 ft. area) in Horticulture College, Khuntpani, West Singhbhum, Chaibasa under BAU, Kanke, Ranchi/124 Dated 04.06.2026/2026_BAU_114878_5 |
Jharkhand |
-- |
| 1890. |
08-Jun-2026 03:00 PM |
22-Jun-2026 02:00 PM |
23-Jun-2026 03:00 PM |
Provision of UPS Point wiring, Lighting arrestor and Repairing of Electrical Installation in Boys Hostel No.08 and 09 at RAC under BAU, Kanke, Ranchi/124 Dated 04.06.2026/2026_BAU_114878_6 |
Jharkhand |
-- |