Central - Tenders Closing in 14 days

Total Tenders : 21441
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
18361. 24-Aug-2026 06:04 PM 16-Sep-2026 03:15 PM 16-Sep-2026 03:15 PM Provision of Construction of NMS (Network Management System) infrastructure of KAVACH at third Floor connecting S&T office Pune Division./DRM-W-PA-E-Tend-2026-N-17/91273124 Ministry of Railways --
18362. 25-Aug-2026 11:58 PM 16-Sep-2026 03:30 PM 16-Sep-2026 03:30 PM GUNA-GWL: Part A)- Provisional of Additional Openings at LHS-81 (5.00 X 2.70 m)and LHS-56 (5.00 X 2.70 m) as RUB by pushing method (Using RH Girder), LHS116 (5.00 x 2.70 m) and LHS-03 (5.00 X 2.70 m) as RUB by Cut Cover method.Part B) Provision of Additional opening as water-way Bridge at km 1263/21-23 byPushing Technique (Using RH Girder)./WCR-BPL-W-26-27-W-17-92/91633895 Ministry of Railways --
18363. 25-Aug-2026 11:26 AM 16-Sep-2026 03:30 PM 16-Sep-2026 03:30 PM GUNA-GWL: Part A)- Provisional of Additional Openings at LHS-81 (5.00 X 2.70 m) and LHS-56 (5.00 X 2.70 m) as RUB by pushing method (Using RH Girder), LHS-116 (5.00 x 2.70 m) and LHS-03 (5.00 X 2.70 m) as RUB by Cut Cover method. Part B) Provision of Additional opening as water-way Bridge at km 1263/21-23 by Pushing Technique (Using RH Girder)./WCR-BPL-W-26-27-W-13-88/91582472 Ministry of Railways --
18364. 25-Aug-2026 07:03 PM 16-Sep-2026 03:30 PM 16-Sep-2026 03:30 PM Guna-Gwalior Section: Through rail renewal TRR (P) at Part A) Km 1124.9-1134.267, Km 1138.43-1142.0 & Km 1143.5-1161.1, Part B) km 1161.1-1169.1 & Km 1170.8-1192.8 and Part C) Km 1192.8-1194.6, Km 1226.4-1229.0, Km 1260.1-1267.2, Km 1284.1-1287.0, Km 1288.2-1290.0 & Km 1292.7-1293.4, Total 77.437 Km under ADEN/Shivpuri section./WCR-BPL-W-26-27-W-14-89/91492983 Ministry of Railways --
18365. 27-Aug-2026 03:05 PM 16-Sep-2026 03:30 PM 16-Sep-2026 03:30 PM Linking of permanent way including transportation of P.Way materials like Rail, Sleeper, Fittings etc. and other associated works as per Railway s specification and standard in connection with Telo to Gomoh ROR line (from Ch: 4150.0, Br. No 7 to Gomoh) and Telo to Matari UP line (from Ch: 4150.0, Br. No 7 to Matari) and Telo to Matari DN line (from Ch: 4150.0, Br. No 7 to Matari) in connection with Construction of Gomoh Fly Over for down connectivity under Dhanbad division of ECR/ECR-CAO-C-S-ETEN-HZME-08/91219017 Ministry of Railways --
18366. 02-Sep-2026 04:00 PM 16-Sep-2026 03:30 PM 17-Sep-2026 03:30 PM Emergent work of lighting arrangement over and under the ROB constructed in lieu of LC No 28 at Railway Km 31 8 9 Delhi Shamli Section Tatiri ROB on NH334B Meerut to Haryana border via Baghpat/NHAI/PIU-BPT/NH-334B/ROB/2026/2026_NHAI_289651_1 National Highways Authority of India --
18367. 01-Sep-2026 04:58 PM 16-Sep-2026 03:30 PM 16-Sep-2026 04:00 PM RATE CONTRACT FOR CIVIL JOBS AT SGW, KULTI WORKS & CO’S BUILDING OF SGW-KULTI TOWNSHIP/SGW/CC/26-27/HR/C&T/OTE/38, DATE: 01/09/2026/106201 Steel Authority of India Ltd --
18368. 26-Aug-2026 12:36 AM 16-Sep-2026 03:30 PM 16-Sep-2026 03:30 PM Guna-Gwalior Section: Through rail renewal TRR (P) at Part A) Km 1196.4-1226.4, Part B) Km 1229.0-1256.6 & Km 1277.8-1281.5 and Part C) km 1298.0-1311.950, Total 75.25 Km under ADEN/Shivpuri section./WCR-BPL-W-26-27-W-18-93/91631558 Ministry of Railways --
18369. 24-Aug-2026 11:08 AM 16-Sep-2026 03:30 PM 16-Sep-2026 03:30 PM Provision of Passenger Lift at Type-V Quarters, Block No.607, Perambur./2026245212329/91352544 Ministry of Railways --
18370. 27-Aug-2026 03:50 PM 16-Sep-2026 03:30 PM 17-Sep-2026 03:30 PM Execution of civil work under Construction of chain link fencing over RR Stone masonry dwarf wall around the north and east sides of monument, and upgradation of toilet blocks at Parihaspora, Pattan Baramulla/4/66-SR/2026-27-C/2026_ASI_923874_1 Archaeological Survey of India --

Note : For more details and clarifications, please refer to the respective Portal.