उच्च मूल्य की निविदाएं खोजें - केंद्रीय
Value of Tenders (Service - 1Cr above, Goods- 50Cr above and Works- 100Cr above)

# कीवर्ड निविदा आईडी, निविदा शीर्षक, निविदा संदर्भ संख्या और निविदा विवरण में मिलान ढूंढता है
Image CAPTCHA
छवि में दिखाए गए अक्षर दर्ज करें.
कुल निविदाएं : 474
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी संगठन का नाम शुद्धिपत्र
311. 03-Aug-2026 05:34 PM 02-Oct-2026 03:00 PM 02-Oct-2026 03:00 PM South Coast Railway (SCoR) (Construction Organization) - Engineering, Procurement and Construction (EPC) Contract for proposed Double Lines with Rail Over Rail (RoR) between new Erragudi & existing Gooty Fort stations, excl. Gooty yard, from Km.0 to Km.7.70 and from Km.9.40 to Km.12.00 (Length - 10.30 Km), in Guntakal division of South Coast Railway (SCoR) in the state of Andhra Pradesh./EPC-01-CAO-C-VSKP-2026/91099217 Ministry of Railways --
312. 03-Aug-2026 04:13 PM 17-Sep-2026 03:00 PM 17-Sep-2026 03:00 PM Design, Supply, Erection, Testing & Commissioning of feeder line, AEC and BEC in connection with upgradation of 1x25KV traction system to 2X25 kV traction system between Bhadrak Khurda Road section of Khurda Road division of East Coast Railway to meet 3000MT loading target. (174RKM/394TKM)/ECoR-2x25-OHE-BK-01A/91129286 Ministry of Railways --
313. 03-Aug-2026 01:29 PM 17-Sep-2026 03:00 PM 17-Sep-2026 03:00 PM Design, Supply, Erection, Testing & Commissioning of feeder line, AEC and BEC in connection with upgradation of 1x25KV traction system to 2X25 kV traction system between Bhadrak Khurda Road section of Khurda Road division of East Coast Railway to meet 3000MT loading target. (174RKM/394TKM)/ECoR-2x25-OHE-BK-01/90983641 Ministry of Railways --
314. 01-Aug-2026 02:02 PM 27-Nov-2026 03:00 PM 27-Nov-2026 03:00 PM NEW BROAD GAUGE SINGLE LINE OF RAILWAY PROJECT COMPRISING THE SECTION COMMENCING FROM PARADOL TAKEOFF POINT (KM 947.257) TO NAGPUR ROAD STATION ( CONNECTING POINT-KM:964.820) AND SLEWING OF EXISTING BORIDAND-CHIRMIRI LINE FROM KM:946.640 TO KM: 947.257 IN THE STATE OF CHHATTISGARH IN THE SOUTH EAST CENTRAL RAILWAY ZONE in EPC Mode./CAO-C-BSP-26-27-15/90263559 Ministry of Railways --
315. 01-Aug-2026 12:34 PM 17-Sep-2026 03:00 PM 17-Sep-2026 03:00 PM Design, Supply, Erection, Testing and Commissioning for OHE upgradation ofexisting 1x25kV system to 2x25kV AT feeding system with feeder and earthingworks in Mahbubnagar(MBNR)(excl)- Dhone(DHNE)(excl) section of HyderabadDivision under South Central Railway. Total 184RKM/184TKM/2x25kV-OHE-MBNR-DHNE-01/91094653 Ministry of Railways --
316. 01-Aug-2026 09:00 AM 17-Sep-2026 11:00 AM 18-Sep-2026 11:30 AM Rectification of 25 no of Accident Spots Blackspots in Karur Dindigul Madurai Kayathar sec of NH44 Chettikulam Natham sec of NH785 and Const of Combined Office Building for RO n PIU Madurai in Tamil Nadu on EPC mode/TNDIV-20013/ 12/2026-Tamil Nadu Division/ E-316367/2026_NHAI_286256_1 National Highways Authority of India --
317. 31-Jul-2026 05:48 PM 09-Dec-2026 11:00 AM 09-Dec-2026 11:00 AM Construction of Sarkhej-Dholera Semi High-Speed Double Railway Line, including Spur lines to Lothal NMHC and Dholera Airport Terminal; comprising civil works, which includes Formation & Viaduct, Bridges, Station buildings, & associated works; Track System (Ballasted & BLT), Overhead Traction System including Electrical General Services; Signalling & Telecommunication System, Operating Control Centre, integration of all systems Complete in all respect including Testing & Com/CPMSHSRADIWRSEJDSIREPC01/91034914 Ministry of Railways --
318. 30-Jul-2026 07:09 PM 30-Oct-2026 03:00 PM 30-Oct-2026 03:00 PM Construction of New BG Double Line from Balodabazar (Km 110.500) to Parmalkasa (Km 280.840) and Y-connectivities from Lakholi station and Marauda Y Cabin including earthwork, Bridges, Rail over Rail (ROR) Bridge , Road over Bridge (ROB), Road under Bridge (RUB), station buildings, track works, Electrification, Signaling &Telecommunication works, and allied miscellaneous works in connection with Kharsia- Naya Raipur-Parmalkasa 5th & 6th Line Project under South East Central Railway in t/CAO-C-BSP-26-27-13/88867297 Ministry of Railways --
319. 30-Jul-2026 06:55 PM 25-Sep-2026 05:00 PM 28-Sep-2026 05:00 PM Treatment of 30 nos of landslide locations from km 64.380 to km 186.085 on NH-09 (Old NH-125) in the State of Uttarakhand under EPC mode in NH(O) Annual Plan 2026-27/NH-09 (Old NH-125)-UK-2026-27-783/2026_MoRTH_919918_1 Ministry of Road Transport and Highways icon image
320. 30-Jul-2026 06:00 PM 05-Oct-2026 03:00 PM 06-Oct-2026 04:00 PM NHID/WB/NH10/SP/8spots/25/NHID/WB/NH10/SP/8spots/25/2026_NHIDC_919855_1 National Highways and Infrastructure Development Corporation icon image

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।