नवीनतम सक्रिय शुद्धिपत्र के लिए खोजें - केंद्रीय

# कीवर्ड निविदा आईडी, निविदा शीर्षक, निविदा संदर्भ संख्या और निविदा विवरण में मिलान ढूंढता है
L8HWQH
छवि में दिखाए गए अक्षर दर्ज करें.
कुल निविदाएं : 2620
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी संगठन का नाम शुद्धिपत्र
1211. 05-Aug-2025 05:00 PM 22-Sep-2025 03:00 PM 23-Sep-2025 03:30 PM Consultancy Services for DPR Preparation of Rehabilitation and Upgradation to 4-lane configuration from Una to Birhu and Lathiani to Bhota of NH-503A and Construction of Missing Link of NH-03 from Km 250/592 to Mandi Bypass in Himachal Pradesh./MoRTH/PIU-HMR/03-503-A /01/DPR/2025-26/747/2025_MoRTH_871990_1 Ministry of Road Transport and Highways View icon
1212. 05-Aug-2025 05:00 PM 30-Aug-2025 04:30 PM 01-Sep-2025 11:00 AM Construction and maintenance of road from L025- Manzmoh Bakerwal Check Km 2nd Rd 700 M To Sarpalan, (Waste Plastic Technology), JK01-4008, Length 3.50 KM, stage Complete, PMGSY-IV (Batch-I, 2025-26) PMGSY Division Division Kulgam./JK014008/2025_KSRRD_143834_1 National Rural Roads Development Agency (NRRDA) View icon
1213. 05-Aug-2025 05:00 PM 30-Aug-2025 04:30 PM 01-Sep-2025 11:00 AM Construction and maintenance of road from L025- Donigam Brinel RD 700 M To Malteng Gujjar Basti, (Waste Plastic Technology), JK18-4001, Length 4.50 KM, stage Complete, PMGSY-IV (Batch-I, 2025-26) PMGSY Division Kulgam./JK184001/2025_KSRRD_143836_1 National Rural Roads Development Agency (NRRDA) View icon
1214. 05-Aug-2025 05:00 PM 30-Aug-2025 04:30 PM 01-Sep-2025 11:00 AM Construction and maintenance of road from L025 (Link Road) Pazalpora Nowpora RD 1500 M To Donawari, (Waste Plastic Technology), JK03-4005, Length - 4.20 KM, stage Complete, PMGSY-IV (Batch-I, 2025-26) PMGSY Division Barramulla ./JK034005/2025_KSRRD_143831_1 National Rural Roads Development Agency (NRRDA) View icon
1215. 05-Aug-2025 05:00 PM 03-Sep-2025 11:00 AM 04-Sep-2025 11:30 AM Rectification work at Risk and Cost of the Concessionaire for Tolling, Operation, Maintenance and Transfer of Four Lane with paved shoulder of NH 44 from Gwalior Jhansi Design Km. 16.000 to Km 98.455 in the state of Madhya Pradesh and Uttar Pradesh/NHAI/ROMP/Gwl/ToT//NH44/2025/2025_NHAI_244032_1 National Highways Authority of India View icon
1216. 05-Aug-2025 05:00 PM 30-Aug-2025 06:00 PM 02-Sep-2025 09:00 AM REPAIRS TO SANITERY ANNEXE PLUMBING LINES AND BLDG WATER TANKS SUNKEN FLOORS OF OTM AREAS UNDER AGE BR 1 AT INS SHIVAJI LONAVLA/GE/LONAVLA/8343/E8/2025_MES_724608_1 E-IN-C BRANCH - MILITARY ENGINEER SERVICES View icon
1217. 05-Aug-2025 05:00 PM 08-Sep-2025 03:00 PM 09-Sep-2025 03:00 PM Compressed Air Pipe Line High Pressure 40 bar/AE/8209/190/2025/COAIRPIP/2025_IITM_244009_1 Indian Institute of Technology Madras View icon
1218. 05-Aug-2025 04:45 PM 09-Sep-2025 12:00 PM 10-Sep-2025 02:00 PM CSB/PK/MPV/IND/LT/ExhaustPipe Support/128/ET-3266/CSB/PK/MPV/IND/LT/ExhaustPipe Support/128/ET-3266/2025_GRSE_97924_1 Garden Reach Shipbuilders and Engineers Ltd. View icon
1219. 05-Aug-2025 04:30 PM 03-Sep-2025 03:00 PM 03-Sep-2025 04:00 PM AUMA MAKE ELECTRICAL ACTUATOR and SPARES FOR BLADE PITCH and IGV/NTPC/USSC-CPG3/9900307967/2025_NTPC_99078_1 NTPC Limited View icon
1220. 05-Aug-2025 04:15 PM 02-Sep-2025 03:00 PM 03-Sep-2025 03:00 PM SUPPLY OF SLIDING PLATES AND DISC SPRINGS/TP/077154C001/000/1383-201/416/2025_REFHQ_186141_1 IndianOil View icon