नवीनतम सक्रिय शुद्धिपत्र के लिए खोजें - केंद्रीय

# कीवर्ड निविदा आईडी, निविदा शीर्षक, निविदा संदर्भ संख्या और निविदा विवरण में मिलान ढूंढता है
XeWA7S
छवि में दिखाए गए अक्षर दर्ज करें.
कुल निविदाएं : 2298
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी संगठन का नाम शुद्धिपत्र
2211. 10-Oct-2025 02:40 PM 25-May-2026 02:00 PM 26-May-2026 02:00 PM Allotment of land on long term lease (annual lease rental basis) of 30 years, on as is where is basis in Zone - 4, Plot 16066 Sq.m. (3.97 Acres) near ATP at EXIM Park area for Covered Storage Godown for Industrial Purpose-Port Related Activities/IENG/Estate/Z-4/ Near ATP/EP/ T/2025, Dt. 10-10-2025/2025_VPT_251907_1 Visakhapatnam Port Trust View icon
2212. 08-Oct-2025 08:00 PM 14-May-2026 11:00 AM 14-May-2026 11:30 AM 765kV AIS New Substation package SS 145T/CC/T/W-AIS/DOM/A04/25/13323/26482 Power Grid Corporation of India Limited View icon
2213. 08-Oct-2025 03:00 PM 07-May-2026 03:00 PM 08-May-2026 03:30 PM EOI FOR ONBOARDING OF SI (SYSTEM INTEGRATOR)/ OPERATORS FOR THE INSTALLATION etc as per EoI document/STPI/GGN/2025-26/dated 25-08-2025/2025_DIT_875860_2 Department of Electronics and Information Technology(DeitY) View icon
2214. 06-Oct-2025 01:00 PM 17-Jun-2026 03:00 PM 19-Jun-2026 11:00 AM Widening and strengthening to 2-Lane with Paved Shoulder of NH-322 Musrigharari to Darbhanga (Km 72.05 to Km 96.00) in the state of Bihar on EPC Mode for the year 2025-26 Job No. NH-322/BHR/2025-26/132 (Including Utility Shifting)./03/NH/Samastipur/EPC/2025-26/2025_MoRTH_880199_1 Ministry of Road Transport and Highways View icon
2215. 03-Oct-2025 05:00 PM 11-May-2026 03:00 PM 12-May-2026 03:00 PM Construction of Maski Bypass Starts at existing Km 144.220 and ends at existing Km 151.760 and Sindhanur Bypass Starts at existing Km 168.370 and ends at existing Km 180.800 on NH 150A in the State of Karnataka/RW/ BNG /NH-150A/Maski Sindhanur Bypass/62/2023( 2nd Call)/2025_MoRTH_880046_1 Ministry of Road Transport and Highways View icon
2216. 01-Oct-2025 06:00 PM 28-May-2026 11:00 AM 29-May-2026 11:30 AM 4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Jagtial (design km. 92.700) to Mancherial (design km. 160.995) total length 68.295 on Hybrid Annuity Mode (HAM)/NHAI/Tech/ TS/2024/239275/2025_NHAI_251031_1 National Highways Authority of India View icon
2217. 01-Oct-2025 06:00 PM 28-May-2026 11:00 AM 29-May-2026 11:30 AM 4-Laning of Jagtial Karimnagar Section of NH-563 from Design Ch.0.000 km (Existing chainage 90/500 on NH-63) to Design Ch. 58.866 km (near SH1 Ch. 170.400 km) at Karimnagar Bypass End (Design Length 58.866 km) on BOT (Toll) mode./NHAI/Tech /TS/2024/239275/2025_NHAI_251035_1 National Highways Authority of India View icon
2218. 01-Oct-2025 05:30 PM 28-May-2026 11:00 AM 29-May-2026 11:30 AM 4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Armoor (design km. 29.100) to Jagtial (design km. 92.700) (total length 63.300 km) on Hybrid Annuity Mode (HAM)/NHAI/Tech /TS/2024/239275/2025_NHAI_251026_1 National Highways Authority of India View icon
2219. 29-Sep-2025 06:00 PM 12-May-2026 11:00 AM 13-May-2026 11:00 AM Construction of 1 Nos VUP and 1 Nos 2 Lane Grade Separator including approaches service road and drain at km 177825 Dadour Junction and km 182 040 Nagchala Junction on NH 154 in the state of Himachal Pradesh on EPC mode/11011/95/Tenders/25-26/13/2025_NHAI_250809_1 National Highways Authority of India View icon
2220. 29-Sep-2025 05:00 PM 11-May-2026 05:00 PM 12-May-2026 11:00 AM Rehabilitation and upgradation of Ghoti to Trimbak section of NH-160A (km 53.500 to km 101.100) to 4-LPS (47.600 km) in the State of Maharashtra on EPC Mode/12014/148/2024-MAH/ZONE-IV-I/2025_MoRTH_879574_1 Ministry of Road Transport and Highways View icon

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।