नवीनतम सक्रिय शुद्धिपत्र के लिए खोजें - केंद्रीय

# कीवर्ड निविदा आईडी, निविदा शीर्षक, निविदा संदर्भ संख्या और निविदा विवरण में मिलान ढूंढता है
Image CAPTCHA
छवि में दिखाए गए अक्षर दर्ज करें.
कुल निविदाएं : 2779
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी संगठन का नाम शुद्धिपत्र
2731. 20-Nov-2025 06:55 PM 17-Aug-2026 03:00 PM 18-Aug-2026 03:00 PM AMMONIA-UREA FERTILIZER PLANT AT AVFCCL, NAMRUP, ASSAM/PNMM/PC230/E/001/2025_PDIL_886333_1 Projects and Development India Limited, Fert View icon
2732. 20-Nov-2025 06:20 PM 27-Aug-2026 06:00 PM 03-Sep-2026 10:00 AM ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) FOR AUGMENTATION OF SEWAGE TREATMENT WORK SYSTEM AT CME KHADKI/84632/2025_MES_740382_1 E-IN-C BRANCH - MILITARY ENGINEER SERVICES View icon
2733. 14-Nov-2025 04:20 PM 02-Sep-2026 11:00 AM 03-Sep-2026 11:30 AM IE Services for 4Laning of Jagtial-Karimnagar Section of NH-563 from Jagtial Bypass Start at Design Ch.0.000 (Ex.chainage 90-500 on NH-63) to Design Ch.58.866 km (Ch.170.400 km) at Karimnagar Bypass End (58.866 km) to be executed on BOT mode NH O/TGDIV/37/2025-Telangana Division/2025_NHAI_255546_1 National Highways Authority of India View icon
2734. 04-Nov-2025 05:20 PM 22-Sep-2026 05:30 PM 24-Sep-2026 01:00 PM up gradation to Two/four lane with paved shoulder configuration of Tuljapur Naldurge Akkalkot road from Naldurge to Akkalkot of bvalance work from Ch 30.884 and ch. 70.800 of Nh 652 on EPC mode in the state of MAharashtra/NHD/TC/EPC/2883/2025 Dt 04/11/2025/2025_MoRTH_884175_1 Ministry of Road Transport and Highways View icon
2735. 04-Nov-2025 04:35 PM 22-Sep-2026 05:30 PM 24-Sep-2026 01:00 PM Rehabilitation and upgradation of NH 548B from km 289.300 to km 342.890 Maharashtra Karnataka Border to two lane with paved shoulder configuration in the state of Maharashtra on EPC mode Total length 52.556 km/NHD/TC/2882/2025 DT 04/11/2025/2025_MoRTH_884165_1 Ministry of Road Transport and Highways View icon
2736. 04-Nov-2025 01:00 PM 22-Sep-2026 05:30 PM 24-Sep-2026 01:00 PM Repairs and Construction of PQC Road Damaged portion 14.1 Km from the work of Karnataka Maharashtra Border Km 70.682 to Akkalkot Km 106.526 and Strengthening of Dudhani Km 74.240 to 77.420 Maindargi Km 89.084 to 92.045 and Akkalkote Km 99.580 to/NHD/TC/EPC/2877/2025 dt 04/11/2025/2025_MoRTH_884044_1 Ministry of Road Transport and Highways View icon
2737. 22-Oct-2025 02:00 PM 24-Aug-2026 11:00 AM 25-Aug-2026 11:00 AM Construction of 3 lane ROB on LHS at Km.1034.092 (existing railway Ch. 491/1-2) and on RHS at Km.1049.823 (existing railway Ch.477/7-9) on Vijayawada Gundugolanu Section of NH-16 in the state of Andhra Pradesh on EPC Mode./NHAI/RO/VJA/ROB/2025/2025_NHAI_253070_1 National Highways Authority of India View icon
2738. 10-Oct-2025 02:40 PM 27-Aug-2026 02:00 PM 28-Aug-2026 02:00 PM Allotment of land on long term lease (annual lease rental basis) of 30 years, on as is where is basis in Zone - 4, Plot 16066 Sq.m. (3.97 Acres) near ATP at EXIM Park area for Covered Storage Godown for Industrial Purpose-Port Related Activities/IENG/Estate/Z-4/ Near ATP/EP/ T/2025, Dt. 10-10-2025/2025_VPT_251907_1 Visakhapatnam Port Trust View icon
2739. 03-Oct-2025 05:00 PM 24-Aug-2026 03:00 PM 25-Aug-2026 03:00 PM Construction of Maski Bypass Starts at existing Km 144.220 and ends at existing Km 151.760 and Sindhanur Bypass Starts at existing Km 168.370 and ends at existing Km 180.800 on NH 150A in the State of Karnataka/RW/ BNG /NH-150A/Maski Sindhanur Bypass/62/2023( 2nd Call)/2025_MoRTH_880046_1 Ministry of Road Transport and Highways View icon
2740. 12-Sep-2025 06:30 PM 21-Aug-2026 11:00 AM 24-Aug-2026 11:30 AM Upgradation to 2 Lane with Paved Shoulders from Design km 0.000 to km 48.742 and km 61.732 to km 102.284 of Bagasara-Una Section of NH-351K in the State of Gujarat on Hybrid Annuity Mode/RW/NH-12014/136/2024/GJ/Zone-V/2025_MoRTH_877249_1 Ministry of Road Transport and Highways View icon

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।