नवीनतम सक्रिय शुद्धिपत्र के लिए खोजें - केंद्रीय

# कीवर्ड निविदा आईडी, निविदा शीर्षक, निविदा संदर्भ संख्या और निविदा विवरण में मिलान ढूंढता है
Image CAPTCHA
छवि में दिखाए गए अक्षर दर्ज करें.
कुल निविदाएं : 2909
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी संगठन का नाम शुद्धिपत्र
2851. 13-Jan-2026 06:55 PM 10-Sep-2026 03:00 PM 11-Sep-2026 03:30 PM Independent Engineer Services for Development of the Ropeway system from Sonprayag to Kedarnath in the State of Uttarakhand on DBFOT Mode/NHLML/Ropeways/IE/Kedarnath/26/2026_NHAI_262924_1 National Highways Authority of India View icon
2852. 09-Jan-2026 09:00 AM 22-Sep-2026 11:00 AM 23-Sep-2026 11:30 AM Const. of 4L GF corridor Ghazipur Zamania Saiyad Raja of NH24 Old NH97 with extens. up to Varanasi Ranchi Kolkata corridor Km 0.000 to Km 51.850 TL 51.850 km in Uttar Pradesh on HAM mode Pkg II/UPDIV/3 /2026-UP Division/ E-304208/2026_NHAI_262336_1 National Highways Authority of India View icon
2853. 09-Jan-2026 09:00 AM 22-Sep-2026 11:00 AM 23-Sep-2026 11:30 AM Upgrad of exist. 4L Corridor from Km 71.000 From Purvanchal Expressway to Km 102.000 Start of Ghazipur Zamania Saiyad Raja sec of NH24 TL 30 km in Uttar Pradesh on HAM mode PKG I/UPDIV/4/ 2026-UP Division/ E-304213/2026_NHAI_262335_1 National Highways Authority of India View icon
2854. 07-Jan-2026 05:30 PM 08-Sep-2026 11:00 AM 09-Sep-2026 11:30 AM 4-Laning of Muzaffarpur- Sitamarhi- Sonbarsa section of NH-22 (Design Ch. Km. 0.000 to Design Ch. Km. 82.551 Total Length 82.551 Km) in the state of Bihar on Hybrid Annuity Mode (HAM)/PROJ-29015(103)/1/ 2026-Bihar Division/E-303765/2026_NHAI_262088_1 National Highways Authority of India View icon
2855. 03-Jan-2026 09:00 AM 04-Jan-2027 02:00 PM 04-Jan-2027 02:30 PM Leasing of Office Space at different floors in IFSCA HQ Building in GIFT City/IFSCA-Admn0IHBP/9/2025-GA/2026_IFSCA_824519_1 International Financial Services Centres Authority View icon
2856. 02-Jan-2026 05:00 PM 09-Sep-2026 11:00 AM 10-Sep-2026 11:00 AM Upgradation of existing Highway to 4 laning Standard from Pachpadara Bypass (Ch. 95.780) to Patau Interchange (Ch. 115.003) Section of NH25 in the State of Rajasthan on EPC mode./NHAI/Patau Pachpadara/2026/2026_NHAI_261436_1 National Highways Authority of India View icon
2857. 30-Dec-2025 06:30 PM 28-Sep-2026 03:00 PM 29-Sep-2026 03:00 PM Construction of Iconic Hybrid Cable Stayed and Suspension Bridge Across Krishna River on NH -167K (Design Chainage km 87.360 to km 88.437) in the States of Telangana and Andhra Pradesh on Engineering, Procurement and Construction (EPC) Basis/RW/HYD/Misc-28/NIT/2025-26/019 dt 30.12.2025/2025_MoRTH_891865_1 Ministry of Road Transport and Highways View icon
2858. 27-Dec-2025 06:00 PM 31-Aug-2026 03:00 PM 01-Sep-2026 03:00 PM Package II Construction of Coffer Dam US and DS Stage I Road Tunnel and Civil and HM works of Diversion Tunnel for Kalai II HEP 1200 MW AP/THDCIL/NCR/CC-538/2025_THDC_891534_1 THDC India Limited View icon
2859. 27-Dec-2025 09:00 AM 02-Sep-2026 03:00 PM 03-Sep-2026 03:30 PM Construction of Breakwater, Rock Bund, Wharf and capital dredging and reclamation for backup yard and allied onshore facilities including maintenance thereof on Hybrid Annuity Model (HAM) under Development of Outer Harbour at V.O. Chidambaranar Port./CIV-OFCPD-PRJ-DEVEL-D4101/2025_VOCPT_260720_1 V.O.Chidambaranar Port Trust View icon
2860. 24-Dec-2025 09:00 AM 02-Sep-2026 11:00 AM 03-Sep-2026 11:30 AM Dev of 4/6L of AC Kanpur Kabrai GF highway start 0.000 (Kanpur Ring road) to 117.700 near Kabrai Sec1 and Overlay/Strengthen other road safety and improvement works on exist Kanpur Kabrai sec from 7.430 to 130.100 of NH34 in UP Sec2 on DBFOT pattern/NHAI/KNP/KANPUR KABRAI/ HamirpurSpur/2025_NHAI_260322_1 National Highways Authority of India View icon

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।