नवीनतम सक्रिय शुद्धिपत्र के लिए खोजें - राज्य

#कीवर्ड निविदा आईडी, निविदा शीर्षक, निविदा संदर्भ संख्या और निविदा विवरण में मिलान ढूंढता है
2r7FEQ
छवि में दिखाए गए अक्षर दर्ज करें.
कुल निविदाएं : 8867
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी राज्य का नाम शुद्धिपत्र
6781. 08-Aug-2025 11:00 AM 15-Sep-2025 02:30 PM 16-Sep-2025 11:00 AM Annual Rate Contract for Supply of Refractory Castable in various power stations of RVUN for FY 2025-26/TN-34/2025-26/2025_RRVUN_492708_1 Rajasthan view icon
6782. 08-Aug-2025 11:00 AM 16-Sep-2025 02:00 PM 17-Sep-2025 03:00 PM Construction work of OSG tank, collection tank, MBBR, tube settler and shed for establishment of waste water treatment plant (200 KLD) at the pond situated in plot no. 680 of area 0.7810 hectare in Mohalla Palhari, Ward-Banwa Palhari,/803/MUKA/2025-26 DATE 05-08-2025/2025_DOLBU_1063956_1 Uttar Pradesh view icon
6783. 08-Aug-2025 11:00 AM 16-Sep-2025 02:00 PM 17-Sep-2025 03:00 PM Work of construction of covered RCC drain around the pond, plot no. 680, area 0.7810 hectare, located in Mohalla Palhari, Ward-Banwa Palhari, within the municipal limits./803/MUKA/2025-26 DATE 05-08-2025/2025_DOLBU_1063965_1 Uttar Pradesh view icon
6784. 08-Aug-2025 11:00 AM 16-Sep-2025 02:00 PM 17-Sep-2025 03:00 PM Work of installation of 200 KLD capacity WTP plant. GATA NO. 680 AREA 0.7810 HECTER/803/MUKA/2025-26 DATE 05-08-2025/2025_DOLBU_1063974_1 Uttar Pradesh view icon
6785. 08-Aug-2025 11:00 AM 16-Sep-2025 02:00 PM 17-Sep-2025 03:00 PM Construction work of OSG tank, collection tank, MBBR, tube settler and shed for establishment of waste water treatment plant (200 KLD) at the pond situated in plot no. 279 of area 0.870 hectare in Mohalla Palhari, Ward Banwa Palhari,/803/MUKA/2025-26 DATE 05-08-2025/2025_DOLBU_1063986_1 Uttar Pradesh view icon
6786. 08-Aug-2025 11:00 AM 11-Sep-2025 11:00 AM 11-Sep-2025 04:30 PM Electrification of Ghanaran Multiplex Pvt Ltd/08/EUDC/JHS/2025-26/2025_DVVNL_1055718_2 Uttar Pradesh view icon
6787. 08-Aug-2025 11:00 AM 16-Sep-2025 02:00 PM 17-Sep-2025 03:00 PM Work of installation of 200 KLD capacity WTP plant. WARD BANWA PALHARI RAHAT NAGAR ME GHASHI RAM TALAB KA ADISTHAPAN KARYA./803/MUKA/2025-26 DATE 05-08-2025/2025_DOLBU_1064078_1 Uttar Pradesh view icon
6788. 08-Aug-2025 11:00 AM 16-Sep-2025 02:00 PM 17-Sep-2025 03:00 PM Work of Installation of 200kld capacity wtp plant. talab gata no. 279 area 0.870 hector banwa palhari mohalla palhari./803/MUKA/2025-26 DATE 05-08-2025/2025_DOLBU_1064251_1 Uttar Pradesh view icon
6789. 08-Aug-2025 11:00 AM 17-Sep-2025 03:00 PM 19-Sep-2025 11:00 AM Body Building with Aluminium Insulation and Reefer Unit of Three Number of Eicher Pro 2049 B CBC BSVI PS LG LX Vehicle/MFED/153/2024-EMC/2025_MFED_783679_1 Kerala view icon
6790. 08-Aug-2025 11:00 AM 16-Sep-2025 02:00 PM 17-Sep-2025 03:00 PM 150 KLD KA WTP PLANT (WARD KOTHIDEEH ME MOHALLA JINHULI ME TALAB GATA NO 193KA AREA 0.0570HECTOR AND GATA NO. 193 KHA 0.702HECTOR KUL 0.759HECTOR KA ADISHTHAPAN KARYA./803/MUKA/2025-26 DATE 05-08-2025/2025_DOLBU_1064114_1 Uttar Pradesh view icon