नवीनतम सक्रिय निविदाओं के लिए खोजें - केंद्रीय

# कीवर्ड निविदा आईडी, निविदा शीर्षक, निविदा संदर्भ संख्या और निविदा विवरण में मिलान ढूंढता है
SM22Cr
छवि में दिखाए गए अक्षर दर्ज करें.
कुल निविदाएं : 13337
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी संगठन का नाम शुद्धिपत्र
12841. 21-Jun-2025 09:00 AM 29-Aug-2025 03:00 PM 01-Sep-2025 04:00 PM Survey, Investigation, Planning, Designing and Construction of Tower-10 and Tower-11 at National Industrial Township at Agartala, Tripura on EPC Mode-I/WAP/CMU III/25-26/SMFPL/Agar/NITP-6/06/2025_WAPCO_239092_1 WAPCOS Limited Icon Image
12842. 21-Jun-2025 09:00 AM 29-Aug-2025 03:00 PM 01-Sep-2025 04:00 PM Survey, Investigation, Planning, Designing and Construction of Tower-8 and Tower-9 at National Industrial Township at Agartala, Tripura on EPC Mode-I/WAP/CMU III/25-26/SMFPL/Agar/NITP-5/05/2025_WAPCO_239091_1 WAPCOS Limited Icon Image
12843. 21-Jun-2025 09:00 AM 29-Aug-2025 03:00 PM 01-Sep-2025 04:00 PM Survey, Investigation, Planning, Designing and Construction of Tower-12 and Tower-13 at National Industrial Township at Agartala, Tripura on EPC Mode-I/WAP/CMU III/25-26/SMFPL/Agar/NITP-7/07/2025_WAPCO_239088_1 WAPCOS Limited Icon Image
12844. 20-Jun-2025 06:30 PM 04-Sep-2025 05:00 PM 08-Sep-2025 11:00 AM Rehabilitation and upgradation of Armori to Gadchiroli section of NH 353C from km 77-900 to 114-800 to Four Lane standards in the state of Maharashtra on HAM Mode (Length -36.900 Km)./RO/MUM/TENDER/2025-26/03/2025_MoRTH_865553_1 Ministry of Road Transport and Highways Icon Image
12845. 20-Jun-2025 06:30 PM 04-Sep-2025 05:00 PM 08-Sep-2025 11:00 AM Rehabilitation and upgradation of Patur-Balapur-Shegaon section of NH-161G from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (Total Length-49.600 km) to 4LPS configuration in the State of Maharashtra on EPC Mode/RO/MUM/TENDER/2025-26/01/2025_MoRTH_865528_1 Ministry of Road Transport and Highways Icon Image
12846. 20-Jun-2025 06:30 PM 04-Sep-2025 05:00 PM 08-Sep-2025 11:00 AM Rehabilitation and upgradation of Shegaon to Maharashtra-MP Border section of NH 161G from km 55-000 to km 118-000 (Length - 63.00 km) to 2LPS configuration in the state of Maharashtra on EPC mode/RO/MUM/TENDER/2025-26/02/2025_MoRTH_865540_1 Ministry of Road Transport and Highways Icon Image
12847. 20-Jun-2025 06:30 PM 04-Sep-2025 05:00 PM 08-Sep-2025 11:00 AM Rehabilitation and Upgradation of Umred-Nagbhir Section from km 48-400 to 96-700 (excluding Bhiwapur city portion from km 68-370 to km 70-770 and RUB) of NH-353D to 4LPS configuration in the State of Maharashtra on HAM mode (total length-45. 834 km)./RO/MUM/TENDER/2025-26/04/2025_MoRTH_865564_1 Ministry of Road Transport and Highways Icon Image
12848. 20-Jun-2025 06:00 PM 25-Aug-2025 03:30 PM 25-Aug-2025 05:00 PM Capital Overhauling of Main Turbine, U-1, NTPC Nabinagar(3X660MW)./NTPC/USSC-CPG3/9900305597/2025_NTPC_97981_1 NTPC Limited Icon Image
12849. 20-Jun-2025 06:00 PM 08-Sep-2025 06:00 PM 15-Sep-2025 11:00 AM PROVN OF 16 X MAJOR MD ACCN (GRIHA 3 STAR RATING) AT TIBRI MIL STN./81073/E8/2025_MES_708948_1 E-IN-C BRANCH - MILITARY ENGINEER SERVICES Icon Image
12850. 20-Jun-2025 05:30 PM 26-Aug-2025 03:00 PM 27-Aug-2025 03:30 PM Expansion of existing Fire and Gas detection system at process plant, Dahej Plant ONGC/ZV8VC25007/2025_ONGC_239061_1 Oil and Natural Gas Corporation Limited Icon Image