नवीनतम सक्रिय निविदाओं के लिए खोजें - केंद्रीय

# कीवर्ड निविदा आईडी, निविदा शीर्षक, निविदा संदर्भ संख्या और निविदा विवरण में मिलान ढूंढता है
ANQ84Z
छवि में दिखाए गए अक्षर दर्ज करें.
कुल निविदाएं : 14467
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी संगठन का नाम शुद्धिपत्र
14321. 12-Mar-2025 04:00 PM 22-Sep-2025 04:00 PM 23-Sep-2025 05:00 PM Bomb 81MM Illuminating MK-II/No. IV/17013/109/2024/Bomb 81MM Illu/PC-4/2025_ITBP_852920_1 DG, Indo-Tibetan Border Police Force Icon Image
14322. 08-Mar-2025 09:00 AM 12-Sep-2025 12:00 PM 15-Sep-2025 02:00 PM EPC CONTRACT FOR REVAMP OF AMMONIA PLANT LINE-I AND LINE-II OF RCF THAL FOR REDUCTION IN ENERGY/Proj/Amm Revamp/2025/02/2025_RCFL_852131_1 Rashtriya Chemicals and Fertilizers Ltd. Icon Image
14323. 08-Mar-2025 09:00 AM 29-Sep-2025 12:00 PM 30-Sep-2025 12:00 PM Construction of road from Cheema to Leechi Nallah Km 16.950 to Km 56.200 to NHSL with paved shoulder specifications and connecting road to Gurdaligali Post length 3.170 and Sarson Post length 1.310 Km to NHSL specification 99 RCC 760 TF P BCN/CE (P) BCN/EPC/01/2024-25/2025_BRO_700678_1 Dte General Border Roads Organisation Icon Image
14324. 08-Mar-2025 09:00 AM 12-Sep-2025 12:00 PM 15-Sep-2025 02:00 PM EPC CONTRACT FOR REVAMP OF AMMONIA PLANT LINE-I AND LINE-II OF RCF THAL FOR REDUCTION IN ENERGY/Proj/Amm Revamp/2025/02/2025_RCFL_852128_1 Rashtriya Chemicals and Fertilizers Ltd. Icon Image
14325. 07-Mar-2025 06:30 PM 25-Aug-2025 05:30 PM 28-Aug-2025 11:00 AM Construction of Major Bridge across Godavari River at Dusalgaon Village at Km. 75.660 Design km. 29.040 and reconstruction of Minor Bridge across Irrigation Canal at Ch. 57.665 Design km 11.045 along Parbhani Gangakhed Road NH 752K in the state of MH/NIT No. 05/EENHD/Latur/480/2025/2025_MoRTH_852423_1 Ministry of Road Transport and Highways Icon Image
14326. 07-Mar-2025 06:00 PM 09-Sep-2025 01:00 PM 10-Sep-2025 02:30 PM SITC of High End Anesthesia Workstation System with OT Monitor/HITES/PCD/NCI-AIIMS/ Equip-II/24-25/2025_HITE_229188_5 HITES Icon Image
14327. 07-Mar-2025 06:00 PM 09-Sep-2025 01:00 PM 10-Sep-2025 02:30 PM SITC of Dialysis/CRRT Unit/HITES/PCD/NCI-AIIMS/ Equip-II/24-25/2025_HITE_229188_3 HITES Icon Image
14328. 07-Mar-2025 06:00 PM 09-Sep-2025 01:00 PM 10-Sep-2025 02:30 PM SITC of Bronchoscope/HITES/PCD/NCI-AIIMS/ Equip-II/24-25/2025_HITE_229188_2 HITES Icon Image
14329. 07-Mar-2025 06:00 PM 09-Sep-2025 01:00 PM 10-Sep-2025 02:30 PM SITC of HFNC/HITES/PCD/NCI-AIIMS/ Equip-II/24-25/2025_HITE_229188_4 HITES Icon Image
14330. 07-Mar-2025 06:00 PM 09-Sep-2025 01:00 PM 10-Sep-2025 02:30 PM SITC of ICU Ventilator with Automatic Closed-Loops Weaning with PAV/HITES/PCD/NCI-AIIMS/ Equip-II/24-25/2025_HITE_229188_7 HITES Icon Image