नवीनतम सक्रिय निविदाओं के लिए खोजें - केंद्रीय

# कीवर्ड निविदा आईडी, निविदा शीर्षक, निविदा संदर्भ संख्या और निविदा विवरण में मिलान ढूंढता है
6ML5ZP
छवि में दिखाए गए अक्षर दर्ज करें.
कुल निविदाएं : 28075
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी संगठन का नाम शुद्धिपत्र
27991. 06-Oct-2025 06:00 PM 27-Apr-2026 04:00 PM 28-Apr-2026 04:00 PM Purchase of Three Dimensional Exoscopy System for Neurosurgery-01 No. for department of Neurosurgery, CNC, AIIMS, New Delhi-110029/87/CNC/ NS/ 2025-26/ St./2025_AIMSD_880259_1 All India Institute of Medical Science-New Delhi Icon Image
27992. 06-Oct-2025 01:00 PM 06-May-2026 03:00 PM 08-May-2026 11:00 AM Widening and strengthening to 2-Lane with Paved Shoulder of NH-322 Musrigharari to Darbhanga (Km 72.05 to Km 96.00) in the state of Bihar on EPC Mode for the year 2025-26 Job No. NH-322/BHR/2025-26/132 (Including Utility Shifting)./03/NH/Samastipur/EPC/2025-26/2025_MoRTH_880199_1 Ministry of Road Transport and Highways Icon Image
27993. 04-Oct-2025 06:30 PM 27-Apr-2026 12:00 PM 28-Apr-2026 12:30 PM Construction of PQC service road, Construction of RCC Drain at several locations and Overlaying of wearing course on Patna-Bakhtiyarpur section of NH-31 (old NH -30) in the State of Bihar/NIT No- 304/RO-PATNA/NHAI/2025-26/2025_NHAI_251244_1 National Highways Authority of India Icon Image
27994. 04-Oct-2025 04:45 PM 06-May-2026 12:00 PM 07-May-2026 12:30 PM Construction of PQC service road and RCC Drains and other Misc. work at Gopalganj - Kotwa section of NH -27 in the state of Bihar./NIT No- 300/RO-PATNA/NHAI/2025-26/2025_NHAI_251226_1 National Highways Authority of India Icon Image
27995. 03-Oct-2025 05:00 PM 11-May-2026 03:00 PM 12-May-2026 03:00 PM Construction of Maski Bypass Starts at existing Km 144.220 and ends at existing Km 151.760 and Sindhanur Bypass Starts at existing Km 168.370 and ends at existing Km 180.800 on NH 150A in the State of Karnataka/RW/ BNG /NH-150A/Maski Sindhanur Bypass/62/2023( 2nd Call)/2025_MoRTH_880046_1 Ministry of Road Transport and Highways Icon Image
27996. 01-Oct-2025 06:00 PM 06-May-2026 11:00 AM 07-May-2026 11:30 AM 4-Laning of Jagtial Karimnagar Section of NH-563 from Design Ch.0.000 km (Existing chainage 90/500 on NH-63) to Design Ch. 58.866 km (near SH1 Ch. 170.400 km) at Karimnagar Bypass End (Design Length 58.866 km) on BOT (Toll) mode./NHAI/Tech /TS/2024/239275/2025_NHAI_251035_1 National Highways Authority of India Icon Image
27997. 01-Oct-2025 06:00 PM 06-May-2026 11:00 AM 07-May-2026 11:30 AM 4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Jagtial (design km. 92.700) to Mancherial (design km. 160.995) total length 68.295 on Hybrid Annuity Mode (HAM)/NHAI/Tech/ TS/2024/239275/2025_NHAI_251031_1 National Highways Authority of India Icon Image
27998. 01-Oct-2025 05:30 PM 06-May-2026 11:00 AM 07-May-2026 11:30 AM 4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Armoor (design km. 29.100) to Jagtial (design km. 92.700) (total length 63.300 km) on Hybrid Annuity Mode (HAM)/NHAI/Tech /TS/2024/239275/2025_NHAI_251026_1 National Highways Authority of India Icon Image
27999. 29-Sep-2025 06:00 PM 12-May-2026 11:00 AM 13-May-2026 11:00 AM Construction of 1 Nos VUP and 1 Nos 2 Lane Grade Separator including approaches service road and drain at km 177825 Dadour Junction and km 182 040 Nagchala Junction on NH 154 in the state of Himachal Pradesh on EPC mode/11011/95/Tenders/25-26/13/2025_NHAI_250809_1 National Highways Authority of India Icon Image
28000. 29-Sep-2025 05:00 PM 28-Apr-2026 05:00 PM 29-Apr-2026 11:00 AM Rehabilitation and upgradation of Ghoti to Trimbak section of NH-160A (km 53.500 to km 101.100) to 4-LPS (47.600 km) in the State of Maharashtra on EPC Mode/12014/148/2024-MAH/ZONE-IV-I/2025_MoRTH_879574_1 Ministry of Road Transport and Highways Icon Image

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।