नवीनतम सक्रिय निविदाओं के लिए खोजें - केंद्रीय

# कीवर्ड निविदा आईडी, निविदा शीर्षक, निविदा संदर्भ संख्या और निविदा विवरण में मिलान ढूंढता है
HQWdGX
छवि में दिखाए गए अक्षर दर्ज करें.
कुल निविदाएं : 28387
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी संगठन का नाम शुद्धिपत्र
28191. 27-Nov-2025 10:00 AM 26-Mar-2026 11:00 AM 27-Mar-2026 11:00 AM Widening and Strengthening work existing 2 lane carriageway to 2 lane with paved shoulder configuration from km. 114.975 to km. 137.684 of NH-117 New NH-12 excluding two major bridges of approx. 1.40 km length from km 118.848 to km 119.506 and km 127/Bid Pkg No. 07/2025-26 of SE, NHC-I/2025_MoRTH_887289_1 Ministry of Road Transport and Highways Icon Image
28192. 27-Nov-2025 09:00 AM 24-Mar-2026 11:00 AM 25-Mar-2026 12:30 PM Construction of RCC Drain in selected stretches/NHAI/13012/190/RO/OD/2773/25/2025_NHAI_256846_1 National Highways Authority of India Icon Image
28193. 26-Nov-2025 06:00 PM 23-Mar-2026 06:00 PM 30-Mar-2026 09:00 AM 753019A ROVN OF 01X 2000 KVA POWER TRANSFORMERS INCLUDING ASSOCIATE EM AND BR INFRA AT MRS DANAPUR CANTT/753019A PROVN OF 01X 2000 KVA POWER TRANSFORMERS INCLUDING ASSOCIATE EM AND BR INFRA AT MRS DANAPUR/2025_MES_739579_1 E-IN-C BRANCH - MILITARY ENGINEER SERVICES Icon Image
28194. 26-Nov-2025 04:30 PM 17-Mar-2026 11:00 AM 18-Mar-2026 11:30 AM Const. of 4L highway from Barabanki ch. Km 0.000 to Mustafabad ch. Km 43.030 Existing Ch. Km 0.000 to Ch. Km 43.700 on the section of NH-927 in Uttar Pradesh on HAM Mode under NH(O) Scheme PKGI/NHAI/HQ/LKW /BB/Pkg-1 /2025/HAM/2025_NHAI_256802_1 National Highways Authority of India Icon Image
28195. 26-Nov-2025 03:20 PM 17-Mar-2026 11:00 AM 18-Mar-2026 11:30 AM Construction of 4 Lane highway from Mustfabad Design chainage Km 43.030 to Biswariya Design chainage Km 101.515 (Existing Chainage Km 43.700 to Chainage Km 98.475) on the section of NH-927 in Uttar Pradesh on HAM Mode under NH(O) Scheme (Package-II)/NHAI/HQ/LKW/BB/Pkg-2/2025/2025_NHAI_256778_1 National Highways Authority of India Icon Image
28196. 25-Nov-2025 05:30 PM 24-Mar-2026 11:00 AM 25-Mar-2026 11:30 AM Construction of new 4-lane Access Controlled Coastal Highway from Rameshwar to Konark (km.0 to km. 79.400) on Hybrid Annuity Mode in the State of Odisha (Package-I)./NHAI/OD/ Coastal Highway/Pkg-1/2025_NHAI_256694_1 National Highways Authority of India Icon Image
28197. 25-Nov-2025 05:10 PM 24-Mar-2026 11:00 AM 25-Mar-2026 11:30 AM Construction of new 2-lane with paved shoulder coastal Highway from Konark to Paradeep (Km.79.400 to Km. 160.180) on Hybrid Annuity Mode in the state of Odisha (Package-II)./NHAI/OD/Coastal Highway/Pkg-2/2025_NHAI_256689_1 National Highways Authority of India Icon Image
28198. 25-Nov-2025 04:00 PM 17-Mar-2026 04:00 PM 18-Mar-2026 04:00 PM Consultancy Services for Authoritys Engineer for supervision of Construction of 2- Lane with paved shoulder from Runarayanpur to Pokharia more of NH-419 in the State of Jharkhand./RO/RNC/NH-419/2025-26/AE/2025_MoRTH_886969_1 Ministry of Road Transport and Highways Icon Image
28199. 24-Nov-2025 06:55 PM 20-Mar-2026 01:00 PM 20-Mar-2026 03:30 PM Main Plant Package for Lara-III(2x800MW), DVC-CIL (2x800MW) and IBTPS-III(2x660MW)/NTPC/EOC/9900312445/2025_NTPC_101320_1 NTPC Limited Icon Image
28200. 24-Nov-2025 06:55 PM 18-Mar-2026 12:00 PM 23-Mar-2026 03:30 PM Widening and Strengthening of NH-20 from Mangalpur to Kayangola from Chainage 35.800 Km to 47.600 Km including construction of spur route of length 4.724 Km from Kayangola to Aradi (Akhandalamani Temple) in the state of Odisha on EPC mode/06 CE NH of 2025-26/2025_MoRTH_886376_1 Ministry of Road Transport and Highways Icon Image

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।