नवीनतम सक्रिय निविदाओं के लिए खोजें - केंद्रीय

# कीवर्ड निविदा आईडी, निविदा शीर्षक, निविदा संदर्भ संख्या और निविदा विवरण में मिलान ढूंढता है
YFeZ5Y
छवि में दिखाए गए अक्षर दर्ज करें.
कुल निविदाएं : 28869
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी संगठन का नाम शुद्धिपत्र
28791. 03-Oct-2025 05:00 PM 11-May-2026 03:00 PM 12-May-2026 03:00 PM Construction of Maski Bypass Starts at existing Km 144.220 and ends at existing Km 151.760 and Sindhanur Bypass Starts at existing Km 168.370 and ends at existing Km 180.800 on NH 150A in the State of Karnataka/RW/ BNG /NH-150A/Maski Sindhanur Bypass/62/2023( 2nd Call)/2025_MoRTH_880046_1 Ministry of Road Transport and Highways Icon Image
28792. 01-Oct-2025 06:00 PM 06-May-2026 11:00 AM 07-May-2026 11:30 AM 4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Jagtial (design km. 92.700) to Mancherial (design km. 160.995) total length 68.295 on Hybrid Annuity Mode (HAM)/NHAI/Tech/ TS/2024/239275/2025_NHAI_251031_1 National Highways Authority of India Icon Image
28793. 01-Oct-2025 06:00 PM 06-May-2026 11:00 AM 07-May-2026 11:30 AM 4-Laning of Jagtial Karimnagar Section of NH-563 from Design Ch.0.000 km (Existing chainage 90/500 on NH-63) to Design Ch. 58.866 km (near SH1 Ch. 170.400 km) at Karimnagar Bypass End (Design Length 58.866 km) on BOT (Toll) mode./NHAI/Tech /TS/2024/239275/2025_NHAI_251035_1 National Highways Authority of India Icon Image
28794. 01-Oct-2025 05:30 PM 06-May-2026 11:00 AM 07-May-2026 11:30 AM 4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Armoor (design km. 29.100) to Jagtial (design km. 92.700) (total length 63.300 km) on Hybrid Annuity Mode (HAM)/NHAI/Tech /TS/2024/239275/2025_NHAI_251026_1 National Highways Authority of India Icon Image
28795. 29-Sep-2025 06:00 PM 12-May-2026 11:00 AM 13-May-2026 11:00 AM Construction of 1 Nos VUP and 1 Nos 2 Lane Grade Separator including approaches service road and drain at km 177825 Dadour Junction and km 182 040 Nagchala Junction on NH 154 in the state of Himachal Pradesh on EPC mode/11011/95/Tenders/25-26/13/2025_NHAI_250809_1 National Highways Authority of India Icon Image
28796. 29-Sep-2025 05:00 PM 11-May-2026 05:00 PM 12-May-2026 11:00 AM Rehabilitation and upgradation of Ghoti to Trimbak section of NH-160A (km 53.500 to km 101.100) to 4-LPS (47.600 km) in the State of Maharashtra on EPC Mode/12014/148/2024-MAH/ZONE-IV-I/2025_MoRTH_879574_1 Ministry of Road Transport and Highways Icon Image
28797. 29-Sep-2025 05:00 PM 11-May-2026 05:00 PM 12-May-2026 11:00 AM Rehabilitation and upgradation of Trimbak - Mokhada - Jawhar - Manor - Palghar section of NH-160A to 2-lane/4-lane with paved shoulder (107.035 km) in the State of Maharashtra on EPC Mode./12014/148/2024-MAH/ZONE-IV-II/2025_MoRTH_879578_1 Ministry of Road Transport and Highways Icon Image
28798. 22-Sep-2025 05:00 PM 22-May-2026 05:30 PM 27-May-2026 12:00 PM PBMC of Rehabilitation and Upgradation of Barasgaon to Rahatee from Existing km 558.200 97.650 to km 615.00 153.150 of NH222 i.e. 61 two lanes with paved shoulder/four lane in the state of Maharashtra for 5 Year Maintenance Period/NIT4/EENH/NED/2608/2025-26/2025_MoRTH_878568_1 Ministry of Road Transport and Highways Icon Image
28799. 22-Sep-2025 05:00 PM 04-May-2026 03:00 PM 05-May-2026 03:00 PM Burner Management System Retrofitting Package for Vindhyachal STPP St-I (6X210MW)/CS-2220-425-9/2025_NTPC_100400_1 NTPC Limited Icon Image
28800. 22-Sep-2025 12:20 PM 30-Jun-2026 05:00 PM 30-Jun-2026 05:30 PM JCI/MKTG/OUTSOURCING/2025-26/JCI/MKTG/OUTSOURCING/2025-26/2025_JCIL_813370_1 Jute Corporation of India Limited --

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।