29421. 10-Jun-2025 05:30 PM 13-Apr-2026 05:30 PM 15-Apr-2026 12:30 PM Upgradation of Shahgarh Buxwaha Narsinghgarh Damoh section of NH-34 (from Ch 113/00 to Ch 176/500) to 2-LPS in the State of Madhya Pradesh on EPC Mode/CE-RO/BHP/Tender/05/2025-26/2025_MoRTH_863777_1 Ministry of Road Transport and Highways Icon Image
29422. 04-Jun-2025 02:00 PM 18-Apr-2026 02:00 PM 20-Apr-2026 02:00 PM NFP/PUR/SB/240050/2523587/NFP/PUR/SB/240050/2523587/2025_NFL_237225_1 National Fertilizers Limited Icon Image
29423. 30-May-2025 05:00 PM 16-Apr-2026 05:30 PM 17-Apr-2026 05:30 PM abilitation Upgradation and Widening of Akola to Mahan section from km 35.265 to km 64.574 (Length 29.309 km) including construction of 4 lane with paved shoulder configuration of Barshi Takli Bypass (Length 3.160 km) on NH161A the State of Maharas/05/EEH/AKL/2025-26, Dt.28.05.2025/2025_MoRTH_862532_1 Ministry of Road Transport and Highways Icon Image
29424. 28-May-2025 05:22 PM 08-Apr-2026 11:00 AM 08-Apr-2026 11:30 AM Transmission Line Package TL01 for LILO of 400kV D/c (Twin) Amargarh (Kunzer) Samba line at Siot Ss/CC/T/W-TW/DOM/A06/25/06804/25810 Power Grid Corporation of India Limited Icon Image
29425. 26-May-2025 06:00 PM 15-May-2026 05:00 PM 18-May-2026 11:00 AM Consultancy Services for Detailed Project Report (DPR) for construction of 4/6-lane Ring Road / Bypass (180 Km) to decongest NH-66 in the State of Goa./RO/MUM/AP/Goa/NH-66/DPR/2025_MoRTH_861680_1 Ministry of Road Transport and Highways Icon Image
29426. 19-May-2025 06:00 PM 30-May-2026 03:00 PM 30-May-2026 04:00 PM EOI FOR TRANSFER OF TECHNOLOGY FOR PRODUCTION OF BATTERY GRADE EMD / EMM. Work/MOIL/MKTG/EMD/EOI/01/2025_MOIL_798670_1 MOIL Limited Icon Image
29427. 21-Apr-2025 07:00 PM 06-Apr-2026 11:00 AM 06-Apr-2026 11:30 AM 400kV GIS Substation Package SS-147/CC/NT/W-GIS/DOM/A06/25/02628/25602 Power Grid Corporation of India Limited Icon Image
29428. 21-Apr-2025 06:30 PM 13-Apr-2026 05:30 PM 15-Apr-2026 12:30 PM Construction/Upgradation of Existing Road to Two Lane with Paved Shoulder for the Stretch of Tikamgarh Badagon Ghuwara Shahgarh from Km 75/000 to Km 155/700 (NH-539) in the State of Madhya Pradesh on Hybrid Annuity Mode/CE-RO/BHP/Tender/01/2025-26/2025_MoRTH_856607_1 Ministry of Road Transport and Highways Icon Image
29429. 11-Apr-2025 04:00 PM 14-Apr-2026 11:00 AM 15-Apr-2026 11:00 AM Rehabilitation and upgradation of Ramachandrapuram Village limits from Km.37.950 to Km.38.950 of Ibrahimpatnam to AP/Telangana Border Section of NH-30 in the State of Andhra Pradesh on EPC Mode./NHAI/RO-VJA/PIU-VIJ/2025/2025_NHAI_232636_1 National Highways Authority of India Icon Image
29430. 09-Apr-2025 06:00 PM 18-Sep-2026 03:00 PM 19-Sep-2026 03:00 PM HLL/ HCS/EOI/2025-26/01/HLL/ HCS/EOI/2025-26/01/2025_HLLLL_794791_1 HLL Lifecare Ltd Icon Image