नवीनतम सक्रिय निविदाओं के लिए खोजें - केंद्रीय

# कीवर्ड निविदा आईडी, निविदा शीर्षक, निविदा संदर्भ संख्या और निविदा विवरण में मिलान ढूंढता है
8LT6K8
छवि में दिखाए गए अक्षर दर्ज करें.
कुल निविदाएं : 30574
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी संगठन का नाम शुद्धिपत्र
30451. 10-Oct-2025 02:40 PM 30-Mar-2026 02:00 PM 31-Mar-2026 02:00 PM Allotment of land on long term lease (annual lease rental basis) of 30 years, on as is where is basis in Zone - 4, Plot 16066 Sq.m. (3.97 Acres) near ATP at EXIM Park area for Covered Storage Godown for Industrial Purpose-Port Related Activities/IENG/Estate/Z-4/ Near ATP/EP/ T/2025, Dt. 10-10-2025/2025_VPT_251907_1 Visakhapatnam Port Trust Icon Image
30452. 08-Oct-2025 08:00 PM 27-Mar-2026 11:00 AM 27-Mar-2026 11:30 AM 765kV AIS New Substation package SS 145T/CC/T/W-AIS/DOM/A04/25/13323/26482 Power Grid Corporation of India Limited Icon Image
30453. 08-Oct-2025 03:00 PM 09-Apr-2026 03:00 PM 10-Apr-2026 03:30 PM EOI FOR ONBOARDING OF SI (SYSTEM INTEGRATOR)/ OPERATORS FOR THE INSTALLATION etc as per EoI document/STPI/GGN/2025-26/dated 25-08-2025/2025_DIT_875860_2 Department of Electronics and Information Technology(DeitY) Icon Image
30454. 06-Oct-2025 06:00 PM 28-Mar-2026 06:00 PM 04-Apr-2026 11:00 AM PROVN OF FORMATION AMMUNITION DUMP IGLOO TYPE (PH-II OF II PHASES) AT NEW CANTT PRAYAGRAJ/980995/PRJ/E8/2025_MES_733965_1 E-IN-C BRANCH - MILITARY ENGINEER SERVICES Icon Image
30455. 06-Oct-2025 01:00 PM 07-Apr-2026 03:00 PM 09-Apr-2026 11:00 AM Widening and strengthening to 2-Lane with Paved Shoulder of NH-322 Musrigharari to Darbhanga (Km 72.05 to Km 96.00) in the state of Bihar on EPC Mode for the year 2025-26 Job No. NH-322/BHR/2025-26/132 (Including Utility Shifting)./03/NH/Samastipur/EPC/2025-26/2025_MoRTH_880199_1 Ministry of Road Transport and Highways Icon Image
30456. 04-Oct-2025 06:30 PM 17-Mar-2026 12:00 PM 18-Mar-2026 12:30 PM Construction of PQC service road, Construction of RCC Drain at several locations and Overlaying of wearing course on Patna-Bakhtiyarpur section of NH-31 (old NH -30) in the State of Bihar/NIT No- 304/RO-PATNA/NHAI/2025-26/2025_NHAI_251244_1 National Highways Authority of India Icon Image
30457. 04-Oct-2025 04:45 PM 17-Mar-2026 12:00 PM 18-Mar-2026 12:30 PM Construction of PQC service road and RCC Drains and other Misc. work at Gopalganj - Kotwa section of NH -27 in the state of Bihar./NIT No- 300/RO-PATNA/NHAI/2025-26/2025_NHAI_251226_1 National Highways Authority of India Icon Image
30458. 03-Oct-2025 05:00 PM 09-Apr-2026 03:00 PM 10-Apr-2026 03:00 PM Construction of Maski Bypass Starts at existing Km 144.220 and ends at existing Km 151.760 and Sindhanur Bypass Starts at existing Km 168.370 and ends at existing Km 180.800 on NH 150A in the State of Karnataka/RW/ BNG /NH-150A/Maski Sindhanur Bypass/62/2023( 2nd Call)/2025_MoRTH_880046_1 Ministry of Road Transport and Highways Icon Image
30459. 03-Oct-2025 04:30 PM 20-Mar-2026 03:00 PM 24-Mar-2026 03:30 PM Engagement of DEA Empaneled Transaction Advisor/02/EE/HCD-3/RFP/DDA/2025-26/2025_DDA_879600_1 Delhi Development Authority Icon Image
30460. 01-Oct-2025 06:00 PM 18-Mar-2026 11:00 AM 19-Mar-2026 11:30 AM 4-Laning of Jagtial Karimnagar Section of NH-563 from Design Ch.0.000 km (Existing chainage 90/500 on NH-63) to Design Ch. 58.866 km (near SH1 Ch. 170.400 km) at Karimnagar Bypass End (Design Length 58.866 km) on BOT (Toll) mode./NHAI/Tech /TS/2024/239275/2025_NHAI_251035_1 National Highways Authority of India Icon Image

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।