नवीनतम सक्रिय निविदाओं के लिए खोजें - केंद्रीय

# कीवर्ड निविदा आईडी, निविदा शीर्षक, निविदा संदर्भ संख्या और निविदा विवरण में मिलान ढूंढता है
YRWKr8
छवि में दिखाए गए अक्षर दर्ज करें.
कुल निविदाएं : 32599
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी संगठन का नाम शुद्धिपत्र
32401. 17-Oct-2025 06:00 PM 02-Mar-2026 11:00 AM 03-Mar-2026 11:30 AM RFP for Construction of Four Lane Katol Bypass section of NH-353J including Mitigation Structures in Tiger Corridor-II from Design Ch. 50.400 to Ch. 63.100 in the State of Maharashtra on EPC Mode/PROJ-28018/6/2025-PIU Nagpur 2/TC-II/E-285055/2025_NHAI_252859_1 National Highways Authority of India Icon Image
32402. 17-Oct-2025 05:05 PM 05-Mar-2026 11:00 AM 06-Mar-2026 11:30 AM Construction of 4-Lanning of Ujjain-Jhalawar (MP-Rajasthan Border) Section of NH-552G from Ch.0.000 Village Khilchipura to Ch.43.900 Village Tanodiya (Package-1) in the State of Madhya Pradesh on Hybrid Annuity Mode (HAM) under NH(O)/MPDIV-21015/17/ 2025-MP Division/2025_NHAI_252828_1 National Highways Authority of India Icon Image
32403. 16-Oct-2025 06:55 PM 19-Feb-2026 11:00 AM 20-Feb-2026 11:30 AM Construction of a 4lane byp. from Thekma village(km36.300) to Gosai Bazar Byp.(km242.500) with 8.135km along with widen. from 2-4Lane from Smt. LM Jun. to PI for a length 4.70km and Streng. of NH-128A from PI-Moha Jun. 41.35km(54.185km) in UP on EPC/UPDIV/22/2025-UP Division/E-296451/2025_NHAI_252669_1 National Highways Authority of India Icon Image
32404. 16-Oct-2025 04:30 PM 19-Feb-2026 05:00 PM 20-Feb-2026 05:30 PM Supply, Installation, Testing and Commissioning of Dual View Hand Baggage and Registered Baggage XBIS at various Airports with one-year onsite warranty and Seven years Comprehensive Annual Maintenance Contract with spares/(AS)-03/2025-26/2025_AAI_251393_1 Airports Authority of India Icon Image
32405. 14-Oct-2025 05:30 PM 17-Mar-2026 11:00 AM 18-Mar-2026 11:30 AM Repairing the project highway on Risks and Costs of the Concessionaire of Six Laning of NH 2 (New NH 44 and NH 19) from Km. 94.000 to Km. 200.000 in the State of UP on item rate basis./NHAI/CMU MTR/NH 44/ Risk n Cost/UP Sec./2025/2025_NHAI_252367_1 National Highways Authority of India Icon Image
32406. 14-Oct-2025 05:30 PM 17-Mar-2026 11:00 AM 18-Mar-2026 11:30 AM Repairing the project highway on Risks and Costs of the Concessionaire of Six Laning of NH 2 (New NH 44 and NH 19) from Km. 20.500 to Km. 94.000 in the State of Haryana on item rate basis./NHAI/CMU MTR/NH 44/ Risk n Cost/Haryana Sec/2025/2025_NHAI_252356_1 National Highways Authority of India Icon Image
32407. 14-Oct-2025 09:00 AM 26-Feb-2026 11:00 AM 27-Feb-2026 11:30 AM IE services for up-graD of ex 2L to 4L with paved shoulder from Deshgaon to Julwaniya sec of NH347B km 0.000 (Ex km99.924 on NH347BG)to km 108.643(Ex km129.900 on NH52) under NH(O) in MP on HAM/MPDIV-21017/50/2025-MP Division/2025_NHAI_252209_1 National Highways Authority of India Icon Image
32408. 14-Oct-2025 09:00 AM 26-Feb-2026 11:00 AM 27-Feb-2026 11:30 AM IE services for const. of 2L with paved shoulder from Hiwarkhedi to Roshni sec of NH347B km0.000 to km90.010 and 2n4 L with PS km114.000 near Ashapur Vill to km 149.000 near Rudhy vill sec of NH347B of Betul Khandwa corri(L125.010 km) in MP on HAM/MPDIV-21017/49/2025-MP Division/2025_NHAI_252206_1 National Highways Authority of India Icon Image
32409. 13-Oct-2025 05:00 PM 14-Mar-2026 11:00 AM 16-Mar-2026 11:00 AM CONSTRUCTION OF ROAD CHANGLANGSHU VILLAGE TO YONGKHAO VILLAGE FROM KM 0.00 TO KM 24.900 (NET LENGTH 24.900 KM) TO NHSL SPECIFICATION UNDER 100 RCC /15 BRTF/ PROJECT SEWAK IN NAGALAND STATE UNDER EPC MODE./CE (P ) SEWAK/EPC/09/2025-26/2025_BRO_734871_1 Dte General Border Roads Organisation Icon Image
32410. 13-Oct-2025 02:00 PM 27-Feb-2026 11:00 AM 27-Feb-2026 11:30 AM 765kV AIS New Substation Package SS-149T/CC/T/W-AIS/DOM/A00/25/13524/26506 Power Grid Corporation of India Limited Icon Image

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।