नवीनतम सक्रिय निविदाओं के लिए खोजें - केंद्रीय

# कीवर्ड निविदा आईडी, निविदा शीर्षक, निविदा संदर्भ संख्या और निविदा विवरण में मिलान ढूंढता है
MReGFa
छवि में दिखाए गए अक्षर दर्ज करें.
कुल निविदाएं : 36950
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी संगठन का नाम शुद्धिपत्र
36881. 10-Oct-2025 05:30 PM 30-Jun-2026 03:00 PM 01-Jul-2026 03:00 PM COAL GASIFICATION PLANT FOR GENERATING SYNTHETIC NATURAL GAS (SNG) AT BARDHAMAN, WEST BENGAL (INDIA)/PNMM/PC-217/E/001/2025_PDIL_881016_1 Projects and Development India Limited, Fert Icon Image
36882. 10-Oct-2025 02:40 PM 25-Jun-2026 02:00 PM 26-Jun-2026 02:00 PM Allotment of land on long term lease (annual lease rental basis) of 30 years, on as is where is basis in Zone - 4, Plot 16066 Sq.m. (3.97 Acres) near ATP at EXIM Park area for Covered Storage Godown for Industrial Purpose-Port Related Activities/IENG/Estate/Z-4/ Near ATP/EP/ T/2025, Dt. 10-10-2025/2025_VPT_251907_1 Visakhapatnam Port Trust Icon Image
36883. 06-Oct-2025 01:00 PM 17-Jun-2026 03:00 PM 19-Jun-2026 11:00 AM Widening and strengthening to 2-Lane with Paved Shoulder of NH-322 Musrigharari to Darbhanga (Km 72.05 to Km 96.00) in the state of Bihar on EPC Mode for the year 2025-26 Job No. NH-322/BHR/2025-26/132 (Including Utility Shifting)./03/NH/Samastipur/EPC/2025-26/2025_MoRTH_880199_1 Ministry of Road Transport and Highways Icon Image
36884. 03-Oct-2025 05:00 PM 29-Jun-2026 03:00 PM 30-Jun-2026 03:00 PM Construction of Maski Bypass Starts at existing Km 144.220 and ends at existing Km 151.760 and Sindhanur Bypass Starts at existing Km 168.370 and ends at existing Km 180.800 on NH 150A in the State of Karnataka/RW/ BNG /NH-150A/Maski Sindhanur Bypass/62/2023( 2nd Call)/2025_MoRTH_880046_1 Ministry of Road Transport and Highways Icon Image
36885. 01-Oct-2025 06:00 PM 24-Jun-2026 11:00 AM 25-Jun-2026 11:30 AM 4-Laning of Jagtial Karimnagar Section of NH-563 from Design Ch.0.000 km (Existing chainage 90/500 on NH-63) to Design Ch. 58.866 km (near SH1 Ch. 170.400 km) at Karimnagar Bypass End (Design Length 58.866 km) on BOT (Toll) mode./NHAI/Tech /TS/2024/239275/2025_NHAI_251035_1 National Highways Authority of India Icon Image
36886. 01-Oct-2025 06:00 PM 24-Jun-2026 11:00 AM 25-Jun-2026 11:30 AM 4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Jagtial (design km. 92.700) to Mancherial (design km. 160.995) total length 68.295 on Hybrid Annuity Mode (HAM)/NHAI/Tech/ TS/2024/239275/2025_NHAI_251031_1 National Highways Authority of India Icon Image
36887. 01-Oct-2025 05:30 PM 24-Jun-2026 11:00 AM 25-Jun-2026 11:30 AM 4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Armoor (design km. 29.100) to Jagtial (design km. 92.700) (total length 63.300 km) on Hybrid Annuity Mode (HAM)/NHAI/Tech /TS/2024/239275/2025_NHAI_251026_1 National Highways Authority of India Icon Image
36888. 22-Sep-2025 05:00 PM 25-Jun-2026 03:00 PM 26-Jun-2026 03:00 PM Burner Management System Retrofitting Package for Vindhyachal STPP St-I (6X210MW)/CS-2220-425-9/2025_NTPC_100400_1 NTPC Limited Icon Image
36889. 22-Sep-2025 12:20 PM 30-Jun-2026 05:00 PM 30-Jun-2026 05:30 PM JCI/MKTG/OUTSOURCING/2025-26/JCI/MKTG/OUTSOURCING/2025-26/2025_JCIL_813370_1 Jute Corporation of India Limited --
36890. 12-Sep-2025 06:30 PM 30-Jun-2026 11:00 AM 01-Jul-2026 11:30 AM Upgradation to 2 Lane with Paved Shoulders from Design km 0.000 to km 48.742 and km 61.732 to km 102.284 of Bagasara-Una Section of NH-351K in the State of Gujarat on Hybrid Annuity Mode/RW/NH-12014/136/2024/GJ/Zone-V/2025_MoRTH_877249_1 Ministry of Road Transport and Highways Icon Image

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।