नवीनतम सक्रिय निविदाओं के लिए खोजें - केंद्रीय

# कीवर्ड निविदा आईडी, निविदा शीर्षक, निविदा संदर्भ संख्या और निविदा विवरण में मिलान ढूंढता है
Ta8de8
छवि में दिखाए गए अक्षर दर्ज करें.
कुल निविदाएं : 36949
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी संगठन का नाम शुद्धिपत्र
36921. 03-Jul-2025 06:30 PM 23-Jun-2026 11:00 AM 24-Jun-2026 11:30 AM Tolling Operation Maintenance and Transfer of Muzzafarpur- Darbanga- Asanpur section of NH-27 in the state of Bihar (TOT Bundle-20)/NHAI/AssetMonetization /TOT/2025-26/ TOTB-20/1/2025_NHAI_240210_1 National Highways Authority of India Icon Image
36922. 20-Jun-2025 03:30 PM 01-Jul-2026 11:00 AM 02-Jul-2026 11:30 AM Const. of 4lane elevated corridor including approaches from Old Pune Naka to Boramani Naka on NH65 in Solapur City on HAM in Maharashtra (Km 0.050 to Km 9.710)/NHAI/MH/Tech /Old Pune Naka-Boramani Naka/ 2025/2025_NHAI_239021_1 National Highways Authority of India Icon Image
36923. 11-Jun-2025 07:44 PM 18-Jun-2026 04:00 PM 18-Jun-2026 04:30 PM 218/EE/Mumbai-IV/2024-25Recall/218/EE/Mumbai-IV/2024-25Recall/115685 Central Public Works Department (CPWD) --
36924. 10-Jun-2025 05:30 PM 24-Jun-2026 05:30 PM 26-Jun-2026 12:30 PM Upgradation of Shahgarh Buxwaha Narsinghgarh Damoh section of NH-34 (from Ch 113/00 to Ch 176/500) to 2-LPS in the State of Madhya Pradesh on EPC Mode/CE-RO/BHP/Tender/05/2025-26/2025_MoRTH_863777_1 Ministry of Road Transport and Highways Icon Image
36925. 30-May-2025 05:00 PM 16-Jun-2026 05:30 PM 17-Jun-2026 05:30 PM abilitation Upgradation and Widening of Akola to Mahan section from km 35.265 to km 64.574 (Length 29.309 km) including construction of 4 lane with paved shoulder configuration of Barshi Takli Bypass (Length 3.160 km) on NH161A the State of Maharas/05/EEH/AKL/2025-26, Dt.28.05.2025/2025_MoRTH_862532_1 Ministry of Road Transport and Highways Icon Image
36926. 19-May-2025 06:00 PM 30-Sep-2026 03:00 PM 30-Sep-2026 04:00 PM EOI FOR TRANSFER OF TECHNOLOGY FOR PRODUCTION OF BATTERY GRADE EMD / EMM. Work/MOIL/MKTG/EMD/EOI/01/2025_MOIL_798670_1 MOIL Limited Icon Image
36927. 21-Apr-2025 06:30 PM 24-Jun-2026 05:30 PM 26-Jun-2026 12:30 PM Construction/Upgradation of Existing Road to Two Lane with Paved Shoulder for the Stretch of Tikamgarh Badagon Ghuwara Shahgarh from Km 75/000 to Km 155/700 (NH-539) in the State of Madhya Pradesh on Hybrid Annuity Mode/CE-RO/BHP/Tender/01/2025-26/2025_MoRTH_856607_1 Ministry of Road Transport and Highways Icon Image
36928. 11-Apr-2025 04:00 PM 15-Jun-2026 11:00 AM 16-Jun-2026 11:00 AM Rehabilitation and upgradation of Ramachandrapuram Village limits from Km.37.950 to Km.38.950 of Ibrahimpatnam to AP/Telangana Border Section of NH-30 in the State of Andhra Pradesh on EPC Mode./NHAI/RO-VJA/PIU-VIJ/2025/2025_NHAI_232636_1 National Highways Authority of India Icon Image
36929. 09-Apr-2025 06:00 PM 18-Sep-2026 03:00 PM 19-Sep-2026 03:00 PM HLL/ HCS/EOI/2025-26/01/HLL/ HCS/EOI/2025-26/01/2025_HLLLL_794791_1 HLL Lifecare Ltd Icon Image
36930. 26-Mar-2025 05:30 PM 24-Jun-2026 05:30 PM 26-Jun-2026 12:30 PM Upgradation of Existing Intermediate Lane Flexible Pavement to 2 Lane with Paved Shoulders Flexible Pavement from Km 0.000 (Orchha) To Km 75.000 (Length 75.000 Km) on Orchha Tikamgarh Shahgarh NH-539 in the State of Madhya Pradesh on EPC Mode/CE-RO/BHP/Tender/03/2024-25/2025_MoRTH_854576_1 Ministry of Road Transport and Highways Icon Image

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।