नवीनतम सक्रिय निविदाओं के लिए खोजें - केंद्रीय

# कीवर्ड निविदा आईडी, निविदा शीर्षक, निविदा संदर्भ संख्या और निविदा विवरण में मिलान ढूंढता है
EZGT3H
छवि में दिखाए गए अक्षर दर्ज करें.
कुल निविदाएं : 14692
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी संगठन का नाम शुद्धिपत्र
41. 20-Jun-2025 06:00 PM 07-Jul-2025 06:55 PM 09-Jul-2025 10:00 AM 8181 REPAIR REWINDING OF CEILING FAN, EXHAUST FANS, AIR CIRCULATOR AND CERTAIN ALLIED ITEMS ETC AT LHS OF NAVAL DOCKYARD UNDER AGE E/M II UNDER GE (NW) KUNJALI/8181/E8/2025_MES_715712_1 E-IN-C BRANCH - MILITARY ENGINEER SERVICES --
42. 20-Jun-2025 06:00 PM 26-Jun-2025 10:00 AM 27-Jun-2025 11:30 AM Servicing of DG Set 625 KVA/IMT/2025-Pur/05/PAC/2025_CSIR_238975_1 Council of Scientific and Industrial Research --
43. 20-Jun-2025 06:00 PM 01-Jul-2025 11:00 AM 02-Jul-2025 11:00 AM Repairing rewinding of two nos. motors 90KW 550V, 1480 RPM CC.NO J 71 Marathon Make and CC.NO. AWS 67, CnG Make under Jhanjra Area/ECL/GM/JNR/EnM/A2/25-26/19 dated 12.06.2025/2025_ECL_337661_1 Eastern Coalfields Limited --
44. 20-Jun-2025 06:00 PM 11-Jul-2025 02:00 PM 12-Jul-2025 03:00 PM NIBMG/ADMIN/ESTB/2025-26/004/NIBMG/ADMIN/ESTB/2025-26/004/2025_NIBMG_802416_1 National Institute of Biomedical Genomics (Department of Biotechnology) --
45. 20-Jun-2025 06:00 PM 30-Jun-2025 02:00 PM 02-Jul-2025 09:00 AM HWPM/MU/W/BG/2505/R0/HWPM/MU/W/BG/2505/R0/2025_HWB_864837_2 Heavy Water Board --
46. 20-Jun-2025 06:00 PM 11-Jul-2025 06:00 PM 18-Jul-2025 10:00 AM REPAIRS/REPLACEMENT OF JOINERY, CUPBOARDS, FALSE CEILING, PARTITIONS ETC IN INS CIRCARS, COMMAND SWIMMING POOL, ENC (O) MESS, NOI, SAILORS INSTITUTE UNDER AGE B/R-II OF GE (NB) VISAKHAPATNAM/C/8508/25-26/E8 TOKEN 29 OF 2025-26/2025_MES_715587_1 E-IN-C BRANCH - MILITARY ENGINEER SERVICES --
47. 20-Jun-2025 06:00 PM 01-Jul-2025 11:00 AM 02-Jul-2025 11:00 AM Repairing rewinding of two no. of electric motor, 110 KW, 550 V, 1480- rpm, Kirloskar Make, CC.NO. AB-83 and Alsthom Make SL.NO. 609391Z03007 under Jhanjra Area./ECL/GM/JNR/EnM/A2/25-26/21 dated 12.06.2025/2025_ECL_337768_1 Eastern Coalfields Limited --
48. 20-Jun-2025 06:00 PM 01-Jul-2025 11:00 AM 02-Jul-2025 11:00 AM Repairing/modification of worn out/damaged discharge chute by dismantling, fabrication etc of steel cord belt conveyor, 0 Dip belt, -2L belt conveyor of MIC,JPC/ECL/GM/JNR/EnM/A2/25-26/23 dated 12.06.2025/2025_ECL_337809_1 Eastern Coalfields Limited --
49. 20-Jun-2025 06:00 PM 01-Jul-2025 11:00 AM 02-Jul-2025 11:00 AM Installation of One no. 6 in dia MS pipe delivery line 600 mtr. from 23BDip 10L to 23BDip 1L, and then to 25D 1L through Inclined, along with Installation of two no s of goalposts for a newly installed pump of 23B Dip in underground at MIC, JPC/ECL/GM/JNR/EnM/A2/25-26/17 dated 12.06.2025/2025_ECL_337647_1 Eastern Coalfields Limited --
50. 20-Jun-2025 06:00 PM 01-Jul-2025 11:00 AM 02-Jul-2025 11:00 AM Transportation of 552 mtr. trackline Total rail length 1104 mtr materials from surface/previous panel and fitting them from 4D/74L to 20D/74L, LHCM-1 in R-VIIA seam/ECL/GM/JNR/EnM/A2/25-26/24 dated 12.06.2025/2025_ECL_337810_1 Eastern Coalfields Limited --