नवीनतम सक्रिय निविदाएं खोजें - राज्य

# कीवर्ड निविदा आईडी, निविदा शीर्षक, निविदा संदर्भ संख्या और निविदा विवरण में मिलान ढूंढता है
NKMrL6
छवि में दिखाए गए अक्षर दर्ज करें.
कुल निविदाएं : 109351
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी राज्य का नाम शुद्धिपत्र
105561. 02-Sep-2025 11:00 AM 30-Sep-2025 03:00 PM 03-Oct-2025 11:00 AM Supply of materials for 28 works/2/mgnrega /2025-26/2025_DP_793638_1 Kerala Icon Image
105562. 02-Sep-2025 11:00 AM 29-Sep-2025 05:00 PM 30-Sep-2025 05:00 PM Tender for Supply of Miscellaneous Machinery and Equipments/STORE-A/52/4382/25-26/2025_MERDM_1212406_1 Maharashtra Icon Image
105563. 02-Sep-2025 11:00 AM 27-Sep-2025 05:00 PM 08-Oct-2025 11:00 AM 17/WBSRDA/MD/2025-26 (1st Call)/SL-13/17/WBSRDA/MD/2025-26 (1st Call)/2025_PRD_897268_13 West Bengal Icon Image
105564. 02-Sep-2025 11:00 AM 27-Sep-2025 05:30 PM 29-Sep-2025 09:00 AM Covered RCC drain work in (1) Rahul Dongre Ji residence to Raviprakash Sharma Ji residence, (2) from opposite Tarun Samarth Vihar Phase 2 to Mintu Paji residence and other places as per the attached list under Gupteshwar ward Zone-04./2025 PRO 457/2025_UAD_446057_1 Madhya Pradesh --
105565. 02-Sep-2025 11:00 AM 30-Oct-2025 05:00 PM 03-Nov-2025 10:00 AM NIET No. - 20 of the FY 2025-2026 of the EE/BQA, PHE Dte.(SL.NO-01)/NIET No. - 20 of the FY 2025-2026 of the EE/BQA, PHE Dte./2025_PHED_897248_1 West Bengal Icon Image
105566. 02-Sep-2025 10:30 AM 27-Sep-2025 03:00 PM 29-Sep-2025 04:00 PM PROCUREMENT OF GI GRATINGS UNDER ANNUAL RATE CONTRACT BASIS 2025-2026/TNPL/PUR/252613003582/2025_TNPL_599336_1 Tamil Nadu Icon Image
105567. 02-Sep-2025 10:00 AM 04-Oct-2025 11:00 AM 06-Oct-2025 05:00 PM State Plan 2025-26 Supply and Laying of 90 mm PVC/HDP/GI/WRD/KWA-CEP/TR/150/2022_26/2025_KWA_793598_1 Kerala Icon Image
105568. 02-Sep-2025 10:00 AM 29-Sep-2025 04:00 PM 30-Sep-2025 02:00 PM Design, Engineering, Providing, Welding, Laying/Fixing in proper position, Testing and Commissioning of 630mm Diameter HDPE Raw Water intake Pipeline in Nigeen Lake from Ashai Bagh Bridge up to the sump of Pokhribal Stage 1st./AMRUT/JSMDS/e-NIT-15 of 09/2025-26/2025_PHE_286465_1 Jammu and Kashmir Icon Image
105569. 02-Sep-2025 10:00 AM 30-Sep-2025 03:00 PM 08-Oct-2025 03:00 PM WBMAD/CM/DLK/NIT-5(e)25-26/2nd call/WBMAD/CM/DLK/NIT-5(e)25-26/2nd call/2025_MAD_897199_1 West Bengal Icon Image
105570. 02-Sep-2025 10:00 AM 29-Sep-2025 06:00 PM 30-Sep-2025 11:00 AM Anti Erosion control/ Flood control works on lidder Nallah from Frislana Pahalgam to Sakhras Bridge at spots( From RD 0-29000M) in Pahalgam, Dachinpora and Khovripora CD Block of District Anantnag./e NIT 14 of 2025.26/2025_IFC_286444_1 Jammu and Kashmir --

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।