नवीनतम सक्रिय निविदाएं खोजें - राज्य

# कीवर्ड निविदा आईडी, निविदा शीर्षक, निविदा संदर्भ संख्या और निविदा विवरण में मिलान ढूंढता है
eFRA7K
छवि में दिखाए गए अक्षर दर्ज करें.
कुल निविदाएं : 141698
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी राज्य का नाम शुद्धिपत्र
140861. 10-Sep-2025 10:00 AM 03-Dec-2025 12:00 PM 05-Dec-2025 04:00 PM Construction of a kitchen shed (L-14, B-12) at Guir ICDS Centre No - 260 (Code19335 311108), benefiting 85 students,APAS/01/259/248/0001/BWN/BDO/KHANDA/NIeT23/25-26/2025_DMB_899267_19 West Bengal Icon Image
140862. 10-Sep-2025 10:00 AM 03-Dec-2025 12:00 PM 05-Dec-2025 04:00 PM Construction of drain cover on the existing drain (L-300ft, B-2.5ft) from Khashinaths House to Swapan Duttas House at Guir Village, benefiting 475 residents,APAS/01/259/248/0008/BWN/BDO/KHANDA/NIeT23/25-26/2025_DMB_899267_26 West Bengal Icon Image
140863. 10-Sep-2025 10:00 AM 03-Dec-2025 12:00 PM 05-Dec-2025 04:00 PM Construction of Concrete Road (L-400 ft, B-4 ft) at Guir Village from Sk Khosnabi House to Srimanta doba, benefiting 150 persons,APAS/01/259/247/0009/BWN/BDO/KHANDA/NIeT23/25-26/2025_DMB_899267_18 West Bengal Icon Image
140864. 10-Sep-2025 10:00 AM 03-Dec-2025 12:00 PM 05-Dec-2025 04:00 PM Construction of Concrete Road (L-400 ft, B-5.5 ft) at Guir Berar Para from Dol Kalitala to Samir Maliks House, benefiting 300 persons,APAS/01/259/247/0008/BWN/BDO/KHANDA/NIeT23/25-26/2025_DMB_899267_17 West Bengal Icon Image
140865. 10-Sep-2025 10:00 AM 03-Dec-2025 12:00 PM 05-Dec-2025 04:00 PM Construction of CC road from Bakir Shop to Bachhu House. Length 300 ft, Breadth 6 ft,APAS/01/259/221/0006/BWN/BDO/KHANDA/NIeT20/25-26/26/2025_DMB_898924_9 West Bengal Icon Image
140866. 10-Sep-2025 10:00 AM 03-Dec-2025 12:00 PM 05-Dec-2025 04:00 PM Installation of LED Light at 1)Masjid tala, 2) Math Para, 3)ICDS Centre, 4)Durgatala, 5)Besides Halim House, 6)Beside nayan Shop, 7) Paschim Para,APAS/01/259/221/0009/BWN/BDO/KHANDA/NIeT20/25-26/26/2025_DMB_898924_11 West Bengal Icon Image
140867. 10-Sep-2025 10:00 AM 03-Dec-2025 12:00 PM 05-Dec-2025 04:00 PM Construction of a road with culvert towards Keudia Sub Centre (Length 150 m, Breadth 10 m), benefiting approximately 2,000 people,APAS/01/259/221/0001/BWN/BDO/KHANDA/NIeT20/25-26/26/2025_DMB_898924_6 West Bengal Icon Image
140868. 10-Sep-2025 10:00 AM 03-Dec-2025 12:00 PM 05-Dec-2025 04:00 PM Improvement and development of a kitchen shed (L-27ft, B-12ft, H-10ft) at Guir Uttarpara Primary School, benefiting 225 local residents,APAS/01/259/246/0001/BWN/BDO/KHANDA/NIeT23/25-26/2025_DMB_899267_1 West Bengal Icon Image
140869. 10-Sep-2025 10:00 AM 03-Dec-2025 12:00 PM 05-Dec-2025 04:00 PM Installation of Submersible Pump with Over Head Tank and PVC Pipe Line Water Supply near House of Pabitra Bag,APAS/01/259/157/0002/BWN/BDO/KHANDA/NIeT-24/25-26/2025_DMB_899452_10 West Bengal Icon Image
140870. 10-Sep-2025 10:00 AM 03-Dec-2025 12:00 PM 05-Dec-2025 04:00 PM Construction of Cover Drain From Samnir House to Mafijul House.. Length 200 ft Breadth 3 ft,APAS/01/259/220/0002/BWN/BDO/KHANDA/NIeT20/25-26/26/2025_DMB_898924_2 West Bengal Icon Image

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।