Search for Latest Active Tenders - Central

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
Image CAPTCHA
Enter the characters shown in the image.
Total Tenders : 31893
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
31811. 14-Jan-2026 09:00 AM 20-Aug-2026 03:00 PM 21-Aug-2026 03:30 PM Construction of DoubleDecker structures for a length of 6.521 Km excluding JP Nagar 4th Ph station from Ch-0.330 Km to Ch.6.326 Km and 4 Nos of Elevated Double Decker Metro Stations JP Nagar 5th Ph,JP Nagar,Kadirenahalli and Kamakya Jn. of BMRCL Ph 3/BMRCL/Ph3/DD/P1/2026/143/2026_BMRCL_262879_1 Bangalore Metro Rail Corporation Limited Icon Image
31812. 14-Jan-2026 09:00 AM 20-Aug-2026 03:00 PM 21-Aug-2026 05:00 PM INTEGRATED DEVELOPMENT AND MECHANIZATION OF BERTH NO 9 AND 10 ON DBFOT BASIS AT HALDIA DOCK COMPLEX/SDM(P and E)/T/28/2025-2026/2026_KoPT_893751_1 Kolkata Port Trust Icon Image
31813. 13-Jan-2026 06:55 PM 10-Sep-2026 03:00 PM 11-Sep-2026 03:30 PM Independent Engineer Services for Development of the Ropeway system from Sonprayag to Kedarnath in the State of Uttarakhand on DBFOT Mode/NHLML/Ropeways/IE/Kedarnath/26/2026_NHAI_262924_1 National Highways Authority of India Icon Image
31814. 09-Jan-2026 09:00 AM 21-Aug-2026 11:00 AM 22-Aug-2026 11:30 AM Upgrad of exist. 4L Corridor from Km 71.000 From Purvanchal Expressway to Km 102.000 Start of Ghazipur Zamania Saiyad Raja sec of NH24 TL 30 km in Uttar Pradesh on HAM mode PKG I/UPDIV/4/ 2026-UP Division/ E-304213/2026_NHAI_262335_1 National Highways Authority of India Icon Image
31815. 09-Jan-2026 09:00 AM 21-Aug-2026 11:00 AM 22-Aug-2026 11:30 AM Const. of 4L GF corridor Ghazipur Zamania Saiyad Raja of NH24 Old NH97 with extens. up to Varanasi Ranchi Kolkata corridor Km 0.000 to Km 51.850 TL 51.850 km in Uttar Pradesh on HAM mode Pkg II/UPDIV/3 /2026-UP Division/ E-304208/2026_NHAI_262336_1 National Highways Authority of India Icon Image
31816. 08-Jan-2026 04:17 PM 01-Sep-2026 11:00 AM 01-Sep-2026 11:01 AM REMOVING EXISTING THERMAL INSULATION, SURFACE PREPARATION OF PIPELINES AND SUPPLY, INSTALLATION, AND COMMISSIONING OF POLYISOCYANURATE FOAM (PIR) INJECTED THERMAL INSULATION SYSTEM WITH ALUMINUM CLADDING FOR CHILLED WATER CARBON STEEL PIPEWORK OF VARIOUS DIAMETERS AT BRBNMPL, SALBONI/006/SAL/MMD-MAINT/2026-27/ET_SAL_MMD-MAINT_006 Bharatiya Reserve Bank Note Mudran Private Limited --
31817. 07-Jan-2026 05:30 PM 08-Sep-2026 11:00 AM 09-Sep-2026 11:30 AM 4-Laning of Muzaffarpur- Sitamarhi- Sonbarsa section of NH-22 (Design Ch. Km. 0.000 to Design Ch. Km. 82.551 Total Length 82.551 Km) in the state of Bihar on Hybrid Annuity Mode (HAM)/PROJ-29015(103)/1/ 2026-Bihar Division/E-303765/2026_NHAI_262088_1 National Highways Authority of India Icon Image
31818. 03-Jan-2026 09:00 AM 04-Jan-2027 02:00 PM 04-Jan-2027 02:30 PM Leasing of Office Space at different floors in IFSCA HQ Building in GIFT City/IFSCA-Admn0IHBP/9/2025-GA/2026_IFSCA_824519_1 International Financial Services Centres Authority Icon Image
31819. 02-Jan-2026 05:00 PM 20-Aug-2026 11:00 AM 21-Aug-2026 11:00 AM Upgradation of existing Highway to 4 laning Standard from Pachpadara Bypass (Ch. 95.780) to Patau Interchange (Ch. 115.003) Section of NH25 in the State of Rajasthan on EPC mode./NHAI/Patau Pachpadara/2026/2026_NHAI_261436_1 National Highways Authority of India Icon Image
31820. 31-Dec-2025 03:27 PM 14-Dec-2026 02:30 PM 14-Dec-2026 02:30 PM HSS TOOL BIT SIZE/59255178A/106927445 Ministry of Railways --

Note : For more details and clarifications, please refer to the respective Portal.