Search for Latest Active Tenders - Central

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
Image CAPTCHA
Enter the characters shown in the image.
Total Tenders : 31537
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
31371. 04-Apr-2026 12:30 PM 31-Aug-2026 02:00 PM 31-Aug-2026 02:30 PM EXPRESSION OF INTEREST TO INVITE PROSPECTIVE AND PROBABLE MANUFACTURES/SUPPLIERS VARIOUS MATERIALS REQUIRED FOR MANUFACTURING OF DIFFERENT TYPES OF PARACHUTES/No.CF-GIL/EoI/PV/2025-26/2025_DoDP_820078_3 Department of Defence Production --
31372. 02-Apr-2026 09:30 PM 31-Aug-2026 02:30 PM 31-Aug-2026 03:00 PM SETTING UP OF 49.5 MW WIND POWER PROJECT AT PAPADAHANDI, ODISHA WITH O&M for 10 yrs/2627000003/2627000003 Neyveli Lignite Corporation Limited Icon Image
31373. 02-Apr-2026 06:00 PM 26-Aug-2026 03:00 PM 27-Aug-2026 04:00 PM Widening of Existing 2 laning stretch Road in available width for Safety Drainage Segregation of Traffic in Phaltan City Start Ch. 138 250 at Bypass start point to End Ch. 144 425 and Construction New ROB at Km 179 730 existing Km 61 100 of NH 965/RO/MUM/Pune/Phaltan/OTI/2026/1/2026_NHAI_273721_1 National Highways Authority of India Icon Image
31374. 02-Apr-2026 05:30 PM 25-Aug-2026 05:30 PM 27-Aug-2026 12:30 PM Widening and strengthening of Garra (near Balaghat)- Waraseoni- MP/MH border section of NH-543K Km 0/000 to Km 51/000 to 2L/2LPS/4L with paved shoulder in the State of Madhya Pradesh on EPC mode/01/SAC/NH/JBP/2026-27/2026_MoRTH_904400_1 Ministry of Road Transport and Highways Icon Image
31375. 02-Apr-2026 05:00 PM 24-Aug-2026 12:00 PM 26-Aug-2026 02:00 PM NCM/IMP/RKS/LT/ SPECTROPHOTOMETER/ORV/ET-3427/NCM/IMP/RKS/LT/ SPECTROPHOTOMETER/ORV/ET-3427/2026_GRSE_99327_1 Garden Reach Shipbuilders and Engineers Ltd. Icon Image
31376. 01-Apr-2026 04:00 PM 01-Sep-2026 03:00 PM 01-Sep-2026 03:30 PM Dredging and Reclamation work for establishment of an Industrial Estate at Paradip, Odisha, India/DCI/HO/OPS/IDCO-Dredging and Reclamation/Paradip/2026/2026_MoS_904219_1 Ministry of Shipping Icon Image
31377. 30-Mar-2026 06:30 PM 21-Aug-2026 12:00 PM 22-Aug-2026 12:30 PM Strengthening and overlay at various stretches of 6-lane access-controlled Greenfield Highway from km 99.000 to km 130.073 of Rajasthan Gujarat Border to Santalpur section of NH-754K in Gujarat on EPC mode at Risk and Cost of existing Contractor/NHAI/ROGNR/NH-754K/ RGBS-IV/R-C/Overlay/2026/2026_NHAI_273566_1 National Highways Authority of India Icon Image
31378. 30-Mar-2026 12:05 PM 27-Aug-2026 06:00 PM 03-Sep-2026 09:00 AM 753041A PROVN OF ADM BLOCK FOR HQ CWE AND GE(W) IN JABALPUR MIL STATION/753041 A PROVN OF ADM BLOCK FOR HQ CWE AND GE W IN JABALPUR MIL STATION/2026_MES_756665_1 E-IN-C BRANCH - MILITARY ENGINEER SERVICES Icon Image
31379. 28-Mar-2026 06:00 PM 01-Sep-2026 06:00 PM 03-Sep-2026 12:00 PM SPECLIAL REPAIRS TO RAJPUT, TALWAR, GODAVARI, KALVERI AND KHUKHARI ROOM AT NOM VARUNA UNDER GE NEW DELHI/CWE-ND/79/2025-26/2026_MES_758320_1 E-IN-C BRANCH - MILITARY ENGINEER SERVICES Icon Image
31380. 27-Mar-2026 06:00 PM 02-Sep-2026 06:00 PM 08-Sep-2026 03:00 PM Development, Operations and Maintenance of ATF Management System under open access on DBFOT basis at Chennai International Airport, Chennai/AAI/BDU/FUEL FARM /CHENNAI/2025-26/2026_AAI_273005_1 Airports Authority of India Icon Image

Note : For more details and clarifications, please refer to the respective Portal.