Search for Latest Active Tenders - Central

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
Image CAPTCHA
Enter the characters shown in the image.
Total Tenders : 33845
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
33831. 10-Jun-2025 05:30 PM 07-Sep-2026 05:30 PM 09-Sep-2026 12:30 PM Upgradation of Shahgarh Buxwaha Narsinghgarh Damoh section of NH-34 (from Ch 113/00 to Ch 176/500) to 2-LPS in the State of Madhya Pradesh on EPC Mode/CE-RO/BHP/Tender/05/2025-26/2025_MoRTH_863777_1 Ministry of Road Transport and Highways Icon Image
33832. 30-May-2025 05:00 PM 15-Sep-2026 05:30 PM 16-Sep-2026 05:30 PM abilitation Upgradation and Widening of Akola to Mahan section from km 35.265 to km 64.574 (Length 29.309 km) including construction of 4 lane with paved shoulder configuration of Barshi Takli Bypass (Length 3.160 km) on NH161A the State of Maharas/05/EEH/AKL/2025-26, Dt.28.05.2025/2025_MoRTH_862532_1 Ministry of Road Transport and Highways Icon Image
33833. 19-May-2025 06:00 PM 30-Sep-2026 03:00 PM 30-Sep-2026 04:00 PM EOI FOR TRANSFER OF TECHNOLOGY FOR PRODUCTION OF BATTERY GRADE EMD / EMM. Work/MOIL/MKTG/EMD/EOI/01/2025_MOIL_798670_1 MOIL Limited Icon Image
33834. 09-Apr-2025 06:00 PM 18-Sep-2026 03:00 PM 19-Sep-2026 03:00 PM HLL/ HCS/EOI/2025-26/01/HLL/ HCS/EOI/2025-26/01/2025_HLLLL_794791_1 HLL Lifecare Ltd Icon Image
33835. 26-Mar-2025 05:30 PM 07-Sep-2026 05:30 PM 09-Sep-2026 12:30 PM Upgradation of Existing Intermediate Lane Flexible Pavement to 2 Lane with Paved Shoulders Flexible Pavement from Km 0.000 (Orchha) To Km 75.000 (Length 75.000 Km) on Orchha Tikamgarh Shahgarh NH-539 in the State of Madhya Pradesh on EPC Mode/CE-RO/BHP/Tender/03/2024-25/2025_MoRTH_854576_1 Ministry of Road Transport and Highways Icon Image
33836. 13-Mar-2025 05:00 PM 07-Sep-2026 12:00 PM 08-Sep-2026 02:00 PM Expression of Interest (EOI) for Enlistment of Architects for Infrastructure Projects/Expression of Interest (EOI) for Enlistment of Architects/2025_EIL_853232_1 Engineers India Limited,MoPNG Icon Image
33837. 16-Dec-2024 09:30 PM 24-Sep-2026 02:30 PM 24-Sep-2026 03:00 PM EOI for Qualifying Requirements for Single Package EPC for 3x125 MW TPP at Gurha, Bikaner dist.(Raj)/2425000238/2425000238 Neyveli Lignite Corporation Limited Icon Image
33838. 29-Oct-2024 04:15 PM 13-Oct-2026 03:00 PM 17-Oct-2026 04:00 PM Widening and strengthening of Daringbadi ghat portion from km 231.000 to 256.000 (Design chainage from km 229.500 to 256.468) of NH-59 under NH(O) in Hybrid Annuity Mode Plan 2023-24 in the State of Odisha (Design length 26.968 Kms)./RO/BBSR/11017/NH(O)/2023-24/2024_MoRTH_833034_1 Ministry of Road Transport and Highways Icon Image
33839. 10-Oct-2024 06:05 PM 01-Sep-2026 11:00 AM 02-Sep-2026 11:30 AM IE Services for Construction of 6-lane Greenfield Highway starting from its Junction with NH-4B (New NH-348) near Pagote (km.0.000) till its Junction on NH-48 at Chowk (km.29.219) in Maharashtra to be executed on BOT (Toll) mode under NH (O)/MHDIV-25011/1/ 2024-Maharashtra-Goa Division/2024_NHAI_211063_1 National Highways Authority of India Icon Image
33840. 19-Sep-2024 02:00 PM 14-Sep-2026 06:00 PM 26-Sep-2026 12:00 PM PROVISION OF OTM ACCOMMODATION AT HAYULIANG UNDER GE P LOHITPUR/89770/HAY/2024_MES_675331_1 E-IN-C BRANCH - MILITARY ENGINEER SERVICES Icon Image

Note : For more details and clarifications, please refer to the respective Portal.