Search for Latest Active Tenders - States

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
KR2Er5
Enter the characters shown in the image.
Total Tenders : 37915
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
37241. 26-Dec-2025 09:00 AM 06-Apr-2026 11:00 AM 07-Apr-2026 01:00 PM Provision of 1X25/31.5MVA,66/11kV Standby TF at 66kVSubstation A2 Faridabad by HVPNL/2025727D87D2 07AD 46AD AF8C 7ABE360A87F4976HVP/2025_HBC_493156_1 Haryana Icon Image
37242. 26-Dec-2025 09:00 AM 06-Apr-2026 11:00 AM 07-Apr-2026 01:00 PM Creation of 04 no. 66 kV line bays at 66 kV substation Escort II to accommodate LILO arrangements of 66 kV D/C Northern lndia-A2 line at 66 kV substation Escort ll, Faridabad/2025C8921F9D 2FFC 4E3F BDCB 96C8C4069BE0976HVP/2025_HBC_493162_1 Haryana Icon Image
37243. 26-Dec-2025 09:00 AM 06-Apr-2026 11:00 AM 07-Apr-2026 01:00 PM Augmentation of 66kV substation Dhauj from (2x12.5/16) MVA to (2x25/31.5) MVA, 66/11 kV T/Fs(T/F T-1) along with extension of control room building by HVPNL/20259DB7567D 0BB3 47C6 BDAD 79FD7B4F2AAB976HVP/2025_HBC_493153_1 Haryana Icon Image
37244. 26-Dec-2025 09:00 AM 06-Apr-2026 11:00 AM 07-Apr-2026 01:00 PM Creation of 1 no. 33 KV bay at 66KV USA to accommodate 33kV line to 33kV S/stn, IAC (DHBVNL), Faridabad (3B4144)./2025D3F6467E 4952 492C BE6E B8945C641D82976HVP/2025_HBC_493155_1 Haryana Icon Image
37245. 26-Dec-2025 09:00 AM 06-Apr-2026 11:00 AM 07-Apr-2026 01:00 PM Augmentation of 66kV substation Partap Steel from (2x 12.5/16) MVA to (1x25/31 .5 plus 1x 12.5/16) MVA, 66/11 kV T/Fs atong with replacement of existing 11kV Panel Set with new matching capacity 11kV panel set/202505EF03FE D7DE 4BFA 9F6E D5247E61A494976HVP/2025_HBC_493161_1 Haryana Icon Image
37246. 26-Dec-2025 09:00 AM 06-Apr-2026 11:00 AM 07-Apr-2026 01:00 PM Replacement of 2 nos. 220kV Old, obsolete and manual operated and 17 nos. Old, obsolete and manual operated 66 kV isolators with new motorized 220kV and 66 kV isolators installed at 220 KV S/Stn BBMB Ballabhgarh/2025590B95BF 7B73 4486 8EC1 ECDF6FED542B976HVP/2025_HBC_493148_1 Haryana Icon Image
37247. 26-Dec-2025 09:00 AM 06-Apr-2026 11:00 AM 07-Apr-2026 01:00 PM Creation of 1 no. 66 kV incoming bay at 66 KV substation Bhupani to accommodate existing T-off arrangement of 66kV D/C Palla-A4 line./20253CB5D745 36EA 43A8 BC1C 5206ECFA09E8976HVP/2025_HBC_493157_1 Haryana Icon Image
37248. 24-Dec-2025 06:50 PM 02-Apr-2026 10:00 AM 06-Apr-2026 12:00 PM Hiring of light commercial vehicle on monthly basis (Bharat stage IV-VI) Motor Cab for Superintending Engineer, North Circle, Housing Directorate, Siliguri./WBHOUSING_SE_NORTH_e-NIQ-10/2025_HSD_979299_1 West Bengal Icon Image
37249. 24-Dec-2025 06:00 PM 13-Apr-2026 03:00 PM 14-Apr-2026 04:00 PM Servicing and Overhauling of Twin lobe Air Blower and Vacuum pump - Make - KFM at Pulp Mechanical in TNPL Unit I/TNPL/TOS/U1/252613006630/2025_TNPL_636091_1 Tamil Nadu Icon Image
37250. 24-Dec-2025 05:30 PM 06-Apr-2026 12:00 PM 06-Apr-2026 01:00 PM Flood Risk Mitigation by providing studs near Village Gulelra on right side of River Beas in District Gurdaspur/29/6-A/2025-26/2025_WR_156565_1 Punjab Icon Image

Note : For more details and clarifications, please refer to the respective Portal.