Search for Latest Active Tenders - States

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
eLBHW4
Enter the characters shown in the image.
Total Tenders : 45465
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
40181. 25-Apr-2026 06:00 PM 18-May-2026 06:00 PM 19-May-2026 12:00 PM Permanent protection work of Balole Syphon damaged and 90 No crates damaged washed away from left side at RD 34400 mtr of MRC by construction of Toe retaining wall./E-NIT NO. 04 of 04/2026-27/2026_IFC_308711_1 Jammu and Kashmir Icon Image
40182. 25-Apr-2026 06:00 PM 18-May-2026 06:00 PM 19-May-2026 12:00 PM Damage to the retaining walls protection works at Aijpur Trewa/E-NIT NO. 04 of 04/2026-27/2026_IFC_308711_5 Jammu and Kashmir Icon Image
40183. 25-Apr-2026 06:00 PM 18-May-2026 06:00 PM 19-May-2026 02:00 PM CIVIL WORK/135/N.P.B.Road/2026-27/2026_DOLBU_1141418_1 Uttar Pradesh --
40184. 25-Apr-2026 06:00 PM 18-May-2026 12:00 PM 18-May-2026 02:00 PM Desilting Saharan01/Desilting Saharan01/2026_WR_167013_1 Punjab Icon Image
40185. 25-Apr-2026 06:00 PM 18-May-2026 03:00 PM 18-May-2026 03:30 PM Under the State Sector, Work of Asphalting, Drain Construction and RCC slab covering from Chhappan Bhog to Tyagi Road in Ward No. 21/1040/Nivida Dt. 16.04.2026/2026_pwd_94694_1 Uttarakhand --
40186. 25-Apr-2026 06:00 PM 18-May-2026 12:00 PM 18-May-2026 03:00 PM 03(W)/EDCH/2026-27/03(W)/EDCH/2026-27/2026_PVVNL_1142118_1 Uttar Pradesh Icon Image
40187. 25-Apr-2026 06:00 PM 18-May-2026 04:00 PM 19-May-2026 12:00 PM Construction of Crated Revetment along with earthen embankment and studs on left bank of Nikki Tawi from Ring Road Bridge to Indo-Pak Border (at Spots)./e-NIT No. 05 of 2026-27/2026_IFC_308721_4 Jammu and Kashmir Icon Image
40188. 25-Apr-2026 06:00 PM 18-May-2026 04:00 PM 19-May-2026 12:00 PM Construction of Damaged Flood Protection Work by way of 18m long Stud 5 Nos. with 6 M Apron on Right Bank of River Waddi Tawi from Bikram Chowk Bridge to Ring Road Bridge (At Places)./e-NIT No. 05 of 2026-27/2026_IFC_308721_3 Jammu and Kashmir Icon Image
40189. 25-Apr-2026 06:00 PM 18-May-2026 04:00 PM 19-May-2026 12:00 PM Construction of protection work at Raipur Upper-A, Barn, Raipur lower Domana-A, Bhalwal Upper-A and B, Raipur lower Domana, Bhalwal lower, Kheri, Kot lower A and B, Ganganagar Seri- Pandita, Mishiriwala, Rajinder nagar nallah, Keran nallah, Daku Chak/e-NIT No. 05 of 2026-27/2026_IFC_308721_2 Jammu and Kashmir Icon Image
40190. 25-Apr-2026 06:00 PM 18-May-2026 04:00 PM 19-May-2026 12:00 PM Construction of Crated Revetment along with earthen embankment and studs on Left bank of Nikki Tawi from 4th Bridge to Ring Road Bridge (at Spots)./e-NIT No. 05 of 2026-27/2026_IFC_308721_8 Jammu and Kashmir Icon Image

Note : For more details and clarifications, please refer to the respective Portal.