Search for Latest Active Tenders - States

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
bBe8SY
Enter the characters shown in the image.
Total Tenders : 69229
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
67001. 16-Jul-2025 11:00 AM 01-Sep-2025 12:00 PM 02-Sep-2025 03:00 PM Anant Nagar Yojna (Mohan Road) ke Sector-5 main 2 X 10 MVA Substation ka Nirman avam Sector ke Vahya vidhyutikaran Ka Karya./85/E-Tender/CE/2025 (02)/2025_LDAUP_1057235_1 Uttar Pradesh Icon Image
67002. 16-Jul-2025 10:00 AM 06-Sep-2025 02:00 PM 06-Sep-2025 04:00 PM REOI/AF(S)162/JICA-PMC/2024-25/2878 A dtd 14/7/2025/2025_FD_45593_1 Assam Icon Image
67003. 16-Jul-2025 10:00 AM 26-Aug-2025 04:00 PM 27-Aug-2025 03:00 PM 39/ECC(D)Ag/2025-26/39/ECC(D)Ag/2025-26/2025_DVVNL_1057311_1 Uttar Pradesh Icon Image
67004. 16-Jul-2025 10:00 AM 26-Aug-2025 04:00 PM 27-Aug-2025 03:00 PM 47/ECC(D)Ag/2025-26/47/ECC(D)Ag/2025-26/2025_DVVNL_1057490_1 Uttar Pradesh Icon Image
67005. 16-Jul-2025 10:00 AM 28-Aug-2025 02:00 PM 30-Aug-2025 04:00 PM Repairing of damaged piston accumulators and hydraulic cylinders of HSLM- 400 System of Loesche Mill of 2X660 MW CTPS, Obra./OBR/CTPS/EMCC-II/BMCD2/25-26/1/2025_RVUNL_1057450_1 Uttar Pradesh Icon Image
67006. 16-Jul-2025 10:00 AM 25-Aug-2025 05:00 PM 26-Aug-2025 03:00 PM Supply, Installation and Commissioning of an EV Charging Station inside the premises of STL Bhubaneswar/03 /A.C.E. (TC, STL) /2025-26/2025_PCEI_115593_1 Odisha Icon Image
67007. 16-Jul-2025 09:00 AM 27-Aug-2025 02:00 PM 28-Aug-2025 04:00 PM Work of Attending breakdowns, construction, re-arrangement, shifting, replacement/repairing of damaged poles etc. of 33KV O/H and U/G lines and Sub-station under the area of Assistant Engineer-Ist, 33 KV and Electrical Safety, Kesco Kanpur/10/S.E.Tech/2025-26/2025_KESCO_1057473_1 Uttar Pradesh Icon Image
67008. 16-Jul-2025 09:00 AM 29-Aug-2025 11:30 AM 29-Aug-2025 02:30 PM E-tender for design, supply, installation commissioning of Alpesa Processing Unit,Wheat Cutting, Sifting Section(Dalia),storage Drum Section for Wheat along with all other required electrical and miscellaneous work on turnkey basis Sanghol Fatehgarh/Pagrexco/Alpesa Processing Unit and Wheat Cutting etc./16.07.2025/2025_PAIC_144898_1 Punjab Icon Image
67009. 16-Jul-2025 09:00 AM 12-Sep-2025 03:00 PM 12-Sep-2025 03:30 PM Design Construction Testing Commissioning and Operation and Maintenance of Infrastructure Works at Integrated Manufacturing Cluster Khurpia Uttarakhand/06/NUITL/2025/2025_SIDCU_85458_1 Uttarakhand Icon Image
67010. 15-Jul-2025 06:55 PM 03-Sep-2025 06:00 PM 04-Sep-2025 06:00 PM DGP/17/6162/MH PS CCTV-Phase 3/Zone 9/46-9/2024/DGP/17/6162/MH PS CCTV-Phase 3/Zone 9/46-9/2024/2025_DGPMU_1200783_1 Maharashtra Icon Image