Search for Latest Active Tenders - Central

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
2FPCLB
Enter the characters shown in the image.
Total Tenders : 29677
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
29091. 04-Nov-2025 05:30 PM 06-Jan-2026 02:00 PM 07-Jan-2026 02:00 PM Supply of Wireless Network Monitoring System for CDW Unit/6746-PPM-413-CA-0055/2025_REFHQ_187422_1 IndianOil Icon Image
29092. 04-Nov-2025 05:20 PM 20-Jan-2026 05:30 PM 22-Jan-2026 01:00 PM up gradation to Two/four lane with paved shoulder configuration of Tuljapur Naldurge Akkalkot road from Naldurge to Akkalkot of bvalance work from Ch 30.884 and ch. 70.800 of Nh 652 on EPC mode in the state of MAharashtra/NHD/TC/EPC/2883/2025 Dt 04/11/2025/2025_MoRTH_884175_1 Ministry of Road Transport and Highways Icon Image
29093. 04-Nov-2025 05:15 PM 28-Jan-2026 03:00 PM 29-Jan-2026 03:00 PM Tender for hiring of Green tug manning, operation, maintenance and technical management of 1 no 60 ton new battery electric tug for a period of 15 years at Chennai Port Authority/M/OPS/F6/2025_ChPT_884166_1 Chennai Port Trust Icon Image
29094. 04-Nov-2025 05:05 PM 09-Jan-2026 05:00 PM 09-Jan-2026 05:15 PM NIT for Implementation of Vehicle Tracking System and Panic Buttons in RSRTC buses/TCIL/DT/2025/RSRTC/2025_TCIL_254441_1 Telecommunications Consultants India Limited Icon Image
29095. 04-Nov-2025 05:00 PM 07-Jan-2026 11:00 AM 07-Jan-2026 02:00 PM DISK SPRING AS PER CLW DRG. NO.1OS.778.669, ALT-5/1E5853107/1E5853107 BHEL Bhopal --
29096. 04-Nov-2025 05:00 PM 20-Jan-2026 05:00 PM 22-Jan-2026 10:00 AM Ultra Low Height/Double Abduction Operating Table with Radiolucent Top/06/SB/M E/2025-26/St./2025_AIMSD_884053_1 All India Institute of Medical Science-New Delhi Icon Image
29097. 04-Nov-2025 04:35 PM 20-Jan-2026 05:30 PM 22-Jan-2026 01:00 PM Rehabilitation and upgradation of NH 548B from km 289.300 to km 342.890 Maharashtra Karnataka Border to two lane with paved shoulder configuration in the state of Maharashtra on EPC mode Total length 52.556 km/NHD/TC/2882/2025 DT 04/11/2025/2025_MoRTH_884165_1 Ministry of Road Transport and Highways Icon Image
29098. 04-Nov-2025 04:20 PM 20-Jan-2026 05:30 PM 22-Jan-2026 01:00 PM Construction of 2 Major and 7 Minor Bridges in the Tembhurni to Kuslamb section of NH 548C and 3 minor bridges in the Kuslamb to Yedshi section of NH 63 to 4 lane standards in the State of Maharashtra on EPC mode/NHD/TC/EPC/2881/2025 Dt 04/11/2025/2025_MoRTH_884147_1 Ministry of Road Transport and Highways Icon Image
29099. 04-Nov-2025 04:00 PM 23-Jan-2026 06:55 PM 30-Jan-2026 11:00 AM Geological exploration by extension of 02 nos. existing drift of size 1.8x2.1m , RDR-2 by 100m length at EL293m and RDR-3 by 150m length at EL 418m at Right Bank with 04 nos. Head room or working space (02 nos. on each Drift) of size (5mX4mX4.5m) fo/NH/SUHEP/PNC/NIT/2025/06 dtd.04.11.2025/2025_NHPC_883772_1 NHPC Limited Icon Image
29100. 04-Nov-2025 03:30 PM 12-Jan-2026 05:30 PM 13-Jan-2026 12:00 PM Construction of a 2L PS Road Over Bridge ROB t km 2 135 parallel to the existing ROB and reconstruction of existing 2 lane ROB at km 48 557 to 4L PS standards in the state of Maharashtra on EPC mode/EENH/Jalna/Tender/NIT No-02/1619/2025-26/2025_MoRTH_884104_1 Ministry of Road Transport and Highways Icon Image

Note : For more details and clarifications, please refer to the respective Portal.