Search for Latest Active Tenders - Central

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
Image CAPTCHA
Enter the characters shown in the image.
Total Tenders : 34496
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
34411. 14-Jan-2026 11:10 AM 10-Sep-2026 03:00 PM 11-Sep-2026 03:30 PM Independent Engineer Services for Development of the Ropeway system from Govindghat to Hemkund Sahib Ji in the State of Uttarakhand on DBFOT Mode./NHLML/Ropeways/IE/Hemkund/2026/2026_NHAI_262943_1 National Highways Authority of India Icon Image
34412. 14-Jan-2026 09:00 AM 03-Oct-2026 03:00 PM 05-Oct-2026 03:30 PM Construction of Double Decker structures for a length of 5.408 Km from Ch.6.326 Km to Ch.11.734 Km and 4 Nos of DoubleDecker Metro Stations, Hoskerehalli, Dwaraka Nagar, Mysore Road and Nagarbhavi Circle of BMRCL, Ph3./BMRCL/Ph3/DD/P2/2026/144/2026_BMRCL_262930_1 Bangalore Metro Rail Corporation Limited Icon Image
34413. 14-Jan-2026 09:00 AM 03-Oct-2026 03:00 PM 05-Oct-2026 03:30 PM Construction of DoubleDecker structures of approx. 6.652 Km from Ch.11.734 Km to Ch.16.746 Km in C1 and from Ch.4.620 Km to Ch.6.260 Km in C2 and Stations.Vinayaka Layout,PapareddyPalya,BDA Complex Nagarbhavi in C1 at Sunkadakatte in C2 of BMRCL,Ph3./BMRCL/Ph3/DD/P3/2026/145/2026_BMRCL_262932_1 Bangalore Metro Rail Corporation Limited Icon Image
34414. 14-Jan-2026 09:00 AM 20-Aug-2026 03:00 PM 21-Aug-2026 05:00 PM INTEGRATED DEVELOPMENT AND MECHANIZATION OF BERTH NO 9 AND 10 ON DBFOT BASIS AT HALDIA DOCK COMPLEX/SDM(P and E)/T/28/2025-2026/2026_KoPT_893751_1 Kolkata Port Trust Icon Image
34415. 14-Jan-2026 09:00 AM 03-Oct-2026 03:00 PM 05-Oct-2026 03:30 PM Construction of DoubleDecker structures for a length of 6.521 Km excluding JP Nagar 4th Ph station from Ch-0.330 Km to Ch.6.326 Km and 4 Nos of Elevated Double Decker Metro Stations JP Nagar 5th Ph,JP Nagar,Kadirenahalli and Kamakya Jn. of BMRCL Ph 3/BMRCL/Ph3/DD/P1/2026/143/2026_BMRCL_262879_1 Bangalore Metro Rail Corporation Limited Icon Image
34416. 13-Jan-2026 06:55 PM 10-Sep-2026 03:00 PM 11-Sep-2026 03:30 PM Independent Engineer Services for Development of the Ropeway system from Sonprayag to Kedarnath in the State of Uttarakhand on DBFOT Mode/NHLML/Ropeways/IE/Kedarnath/26/2026_NHAI_262924_1 National Highways Authority of India Icon Image
34417. 09-Jan-2026 09:00 AM 21-Aug-2026 11:00 AM 22-Aug-2026 11:30 AM Const. of 4L GF corridor Ghazipur Zamania Saiyad Raja of NH24 Old NH97 with extens. up to Varanasi Ranchi Kolkata corridor Km 0.000 to Km 51.850 TL 51.850 km in Uttar Pradesh on HAM mode Pkg II/UPDIV/3 /2026-UP Division/ E-304208/2026_NHAI_262336_1 National Highways Authority of India Icon Image
34418. 09-Jan-2026 09:00 AM 21-Aug-2026 11:00 AM 22-Aug-2026 11:30 AM Upgrad of exist. 4L Corridor from Km 71.000 From Purvanchal Expressway to Km 102.000 Start of Ghazipur Zamania Saiyad Raja sec of NH24 TL 30 km in Uttar Pradesh on HAM mode PKG I/UPDIV/4/ 2026-UP Division/ E-304213/2026_NHAI_262335_1 National Highways Authority of India Icon Image
34419. 08-Jan-2026 04:17 PM 01-Sep-2026 11:00 AM 01-Sep-2026 11:01 AM REMOVING EXISTING THERMAL INSULATION, SURFACE PREPARATION OF PIPELINES AND SUPPLY, INSTALLATION, AND COMMISSIONING OF POLYISOCYANURATE FOAM (PIR) INJECTED THERMAL INSULATION SYSTEM WITH ALUMINUM CLADDING FOR CHILLED WATER CARBON STEEL PIPEWORK OF VARIOUS DIAMETERS AT BRBNMPL, SALBONI/006/SAL/MMD-MAINT/2026-27/ET_SAL_MMD-MAINT_006 Bharatiya Reserve Bank Note Mudran Private Limited --
34420. 07-Jan-2026 05:30 PM 08-Sep-2026 11:00 AM 09-Sep-2026 11:30 AM 4-Laning of Muzaffarpur- Sitamarhi- Sonbarsa section of NH-22 (Design Ch. Km. 0.000 to Design Ch. Km. 82.551 Total Length 82.551 Km) in the state of Bihar on Hybrid Annuity Mode (HAM)/PROJ-29015(103)/1/ 2026-Bihar Division/E-303765/2026_NHAI_262088_1 National Highways Authority of India Icon Image

Note : For more details and clarifications, please refer to the respective Portal.