Search for Latest Active Tenders - Central

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
Image CAPTCHA
Enter the characters shown in the image.
Total Tenders : 34496
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
34481. 09-Apr-2025 06:00 PM 18-Sep-2026 03:00 PM 19-Sep-2026 03:00 PM HLL/ HCS/EOI/2025-26/01/HLL/ HCS/EOI/2025-26/01/2025_HLLLL_794791_1 HLL Lifecare Ltd Icon Image
34482. 26-Mar-2025 05:30 PM 20-Aug-2026 03:30 PM 21-Aug-2026 05:00 PM Upgradation of Existing Intermediate Lane Flexible Pavement to 2 Lane with Paved Shoulders Flexible Pavement from Km 0.000 (Orchha) To Km 75.000 (Length 75.000 Km) on Orchha Tikamgarh Shahgarh NH-539 in the State of Madhya Pradesh on EPC Mode/CE-RO/BHP/Tender/03/2024-25/2025_MoRTH_854576_1 Ministry of Road Transport and Highways Icon Image
34483. 13-Mar-2025 05:00 PM 07-Sep-2026 12:00 PM 08-Sep-2026 02:00 PM Expression of Interest (EOI) for Enlistment of Architects for Infrastructure Projects/Expression of Interest (EOI) for Enlistment of Architects/2025_EIL_853232_1 Engineers India Limited,MoPNG Icon Image
34484. 10-Jan-2025 06:00 PM 22-Aug-2026 11:00 AM 24-Aug-2026 11:30 AM Independent Engineer Services for Construction of STRR (West side) NH948A Kunigal (Ramanagara Taluk) to S. Mudugadapalli (Hosur Taluk) from Km 79 to km 144.25/144.00 (Design Chainage) Phase-II in Karnataka on HAM (Project Length 65.25 kms)/NHAI/KNT/STRR/Phase-II/IE/ 2025/271368/2025_NHAI_223724_1 National Highways Authority of India Icon Image
34485. 10-Jan-2025 06:00 PM 22-Aug-2026 11:00 AM 24-Aug-2026 11:30 AM Independent Engineer Services for construction of STRR (West side) NH948A Obalapura (Nelamangala Taluk)) to Kunigal (Ramanagara Taluk) from Km 0 to km 79 (Design Chainage) Phase-I in Karnataka on HAM (Project Length 79 kms)/NHAI/KNT/STRR/Phase-I/ IE/2025/271352/2025_NHAI_223720_1 National Highways Authority of India Icon Image
34486. 07-Jan-2025 06:30 PM 22-Aug-2026 11:00 AM 24-Aug-2026 11:30 AM Const. of STRR(West side) NH948A Kunigal (Ramanagara Taluk) to S Mudugadapalli (Hosur Taluk) from Km 79 to km 144.25 144.00 DC PhaseII in Karnataka on HAM (PL 65.25 kms)/NHAI/KNT/STRR /Phase-2/ 2025/182995/2025_NHAI_223343_1 National Highways Authority of India Icon Image
34487. 07-Jan-2025 06:00 PM 22-Aug-2026 11:00 AM 24-Aug-2026 11:30 AM Const. of STRR (West side) NH948A Obalapura (Nelamangala Taluk))to Kunigal(Ramanagara Taluk) from Km 0 to km 79 DC PhaseI in Karnataka on HAM (PL79 kms)/NHAI/KNT/STRR /Phase-1 /2025/170399/2025_NHAI_223321_1 National Highways Authority of India Icon Image
34488. 16-Dec-2024 09:30 PM 24-Sep-2026 02:30 PM 24-Sep-2026 03:00 PM EOI for Qualifying Requirements for Single Package EPC for 3x125 MW TPP at Gurha, Bikaner dist.(Raj)/2425000238/2425000238 Neyveli Lignite Corporation Limited Icon Image
34489. 29-Oct-2024 04:15 PM 13-Oct-2026 03:00 PM 17-Oct-2026 04:00 PM Widening and strengthening of Daringbadi ghat portion from km 231.000 to 256.000 (Design chainage from km 229.500 to 256.468) of NH-59 under NH(O) in Hybrid Annuity Mode Plan 2023-24 in the State of Odisha (Design length 26.968 Kms)./RO/BBSR/11017/NH(O)/2023-24/2024_MoRTH_833034_1 Ministry of Road Transport and Highways Icon Image
34490. 10-Oct-2024 06:05 PM 01-Sep-2026 11:00 AM 02-Sep-2026 11:30 AM IE Services for Construction of 6-lane Greenfield Highway starting from its Junction with NH-4B (New NH-348) near Pagote (km.0.000) till its Junction on NH-48 at Chowk (km.29.219) in Maharashtra to be executed on BOT (Toll) mode under NH (O)/MHDIV-25011/1/ 2024-Maharashtra-Goa Division/2024_NHAI_211063_1 National Highways Authority of India Icon Image

Note : For more details and clarifications, please refer to the respective Portal.