Search for Latest Active Tenders - States

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
Image CAPTCHA
Enter the characters shown in the image.
Total Tenders : 63393
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
58311. 29-Sep-2026 05:00 PM 22-Oct-2026 01:00 PM 22-Oct-2026 02:00 PM Package No.569_3/SE(B)/21-22/Pt-IV/18/569_3/2026_BoTC_54213_1 Assam --
58312. 29-Sep-2026 05:00 PM 22-Oct-2026 01:00 PM 22-Oct-2026 02:00 PM Package No.569_2/SE(B)/21-22/Pt-IV/18/569_2/2026_BoTC_54212_1 Assam --
58313. 29-Sep-2026 05:00 PM 22-Oct-2026 01:00 PM 22-Oct-2026 02:00 PM Package No.569_1/SE(B)/21-22/Pt-IV/18/569_1/2026_BoTC_54211_1 Assam --
58314. 29-Sep-2026 05:00 PM 23-Oct-2026 05:30 PM 24-Oct-2026 11:30 AM camc for HVAC Chiller System at Admin Building of NMRC Depot for 3 years and SITC of VRV/VRF System/NMRC/E AND M/CAMC HVAC AND SITC VRF/2026/480/2026_NMRCL_1191266_1 Uttar Pradesh --
58315. 29-Sep-2026 05:00 PM 20-Oct-2026 05:00 PM 21-Oct-2026 11:00 AM Construction of a covered drain on Ramnagar Road in Ward-Kazipur-01, extending from Sai Pipe Shop to the area beyond Lotus Marriage Lawn./63/NPF/2026-27/2026_DOLBU_1191189_2 Uttar Pradesh --
58316. 29-Sep-2026 05:00 PM 21-Oct-2026 12:00 PM 22-Oct-2026 12:00 PM TD12/12/EE(EM)/PB/2026-27/2026_UJVN_100745_1 Uttarakhand --
58317. 29-Sep-2026 05:00 PM 21-Oct-2026 12:00 PM 21-Oct-2026 03:00 PM Electrification Work in MP MLA fund and other full deposit scheme under Electricity Distribution division, Pratapgarh on semi turnkey basis including loading and unloading of material./44/EDCP/2026-27/2026_PVVNV_1191181_1 Uttar Pradesh --
58318. 29-Sep-2026 05:00 PM 21-Oct-2026 12:00 PM 21-Oct-2026 03:00 PM Electrification Work in MP MLA fund and other full deposit scheme under Electricity Distribution division Kunda, Pratapgarh on semi turnkey basis including loading and unloading of material./45/EDCP/2026-27/2026_PVVNV_1191198_1 Uttar Pradesh --
58319. 29-Sep-2026 05:00 PM 21-Oct-2026 12:00 PM 21-Oct-2026 03:00 PM Electrification Work in MP MLA fund and other full deposit scheme under Electricity Distribution division Lalganj, Pratapgarh on semi turnkey basis including loading and unloading of material./46/EDCP/2026-27/2026_PVVNV_1191227_1 Uttar Pradesh --
58320. 29-Sep-2026 05:00 PM 21-Oct-2026 12:00 PM 21-Oct-2026 03:00 PM Electrification Work in MP MLA fund and other full deposit scheme under Electricity Distribution division Raniganj, Pratapgarh on semi turnkey basis including loading and unloading of material./47/EDCP/2026-27/2026_PVVNV_1191267_1 Uttar Pradesh --

Note : For more details and clarifications, please refer to the respective Portal.