Search for Latest Active Tenders - States

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
Image CAPTCHA
Enter the characters shown in the image.
Total Tenders : 63397
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
58321. 29-Sep-2026 05:00 PM 19-Oct-2026 05:00 PM 21-Oct-2026 10:00 AM SQUIRREL CAGE INDUCTION MOTOR/TP/MTLS/SQUIRREL CAGE INDUCTION MOTOR/2026-27/2026_KMML_874365_1 Kerala Icon Image
58322. 29-Sep-2026 05:00 PM 21-Oct-2026 04:00 PM 22-Oct-2026 11:00 AM const. of Boundary wall at 4 MLD STP samrala and all other works contingent thereto distt Ludhiana Under Jal hi Amrit/E Tender 27 of 09/ 2026/2026_DLG_176467_1 Punjab Icon Image
58323. 29-Sep-2026 05:00 PM 21-Oct-2026 05:00 PM 23-Oct-2026 03:30 PM Construction of Road from Jay Bharat High School to Debu Bhatta Charya Residence (L-2.400 Km.)/14/RWD/DHANBAD/26-27/2026_RWD_119364_2 Jharkhand --
58324. 29-Sep-2026 05:00 PM 21-Oct-2026 05:00 PM 21-Oct-2026 05:30 PM GREENING AND END TO END PAVING BY INTERLOCKIMG TILE FOR DUST MITIGATION AT SAUR URZA MARG AT I.A. SAHIBABAD SITE-IV DISTT- GHAZIABAD/CD-I(241) DATED 21.09.2026/2026_SIDC_1191225_1 Uttar Pradesh --
58325. 29-Sep-2026 05:00 PM 23-Oct-2026 03:00 PM 24-Oct-2026 03:00 PM E Tender for Carrying out Dyuthi HT Works under Electrical Section,Korom for the year 2026-27 1 Interlinking Thavinjal Feeder and Vellamunda Feeder from Kulathada to Puthusseri ES Korom Labour Contract/07/PMU/KPTA/2026-27/29-09-2026/2026_KSEB_874560_1 Keralam Icon Image
58326. 29-Sep-2026 05:00 PM 21-Oct-2026 12:00 PM 22-Oct-2026 12:00 PM TD12/12/EE(EM)/PB/2026-27/2026_UJVN_100745_1 Uttarakhand --
58327. 29-Sep-2026 05:00 PM 21-Oct-2026 12:00 PM 21-Oct-2026 03:00 PM Electrification Work in MP MLA fund and other full deposit scheme under Electricity Distribution division, Pratapgarh on semi turnkey basis including loading and unloading of material./44/EDCP/2026-27/2026_PVVNV_1191181_1 Uttar Pradesh --
58328. 29-Sep-2026 05:00 PM 21-Oct-2026 12:00 PM 21-Oct-2026 03:00 PM Electrification Work in MP MLA fund and other full deposit scheme under Electricity Distribution division Kunda, Pratapgarh on semi turnkey basis including loading and unloading of material./45/EDCP/2026-27/2026_PVVNV_1191198_1 Uttar Pradesh --
58329. 29-Sep-2026 05:00 PM 21-Oct-2026 12:00 PM 21-Oct-2026 03:00 PM Electrification Work in MP MLA fund and other full deposit scheme under Electricity Distribution division Lalganj, Pratapgarh on semi turnkey basis including loading and unloading of material./46/EDCP/2026-27/2026_PVVNV_1191227_1 Uttar Pradesh --
58330. 29-Sep-2026 05:00 PM 21-Oct-2026 12:00 PM 21-Oct-2026 03:00 PM Electrification Work in MP MLA fund and other full deposit scheme under Electricity Distribution division Raniganj, Pratapgarh on semi turnkey basis including loading and unloading of material./47/EDCP/2026-27/2026_PVVNV_1191267_1 Uttar Pradesh --

Note : For more details and clarifications, please refer to the respective Portal.